ISub-Master BMS + 7 Battery Modules
Battery Stack Installation
Please use 7pcs Inverter Back Sheet
expansion screws to fix the Inverter’s back
minimum 300mm
Check installation environment to ensure
ground level.
Place the first battery on the ground, with
the cushion facing down, and make sure it
is level and stable. The remaining battery
and master control are then placed in turn.
After the battery stack is secured, install
the stackble fixed bar. Install in the top
two stability bracket on the left side of
the battery and the Sub-Master BMS, and
ensure stability.
1) Use the back sheet as the template to
mark the position of holes on the wall.
Make sure the back sheet is in a horizontal
position.
2) Use an electrical driller to drill holes
on the wall and make sure hole depth is
enough.
3) Insert the expansion tubes into the holes
and tighten them, then fix the bracket onto
the wall with expansion screws by using a
cross screwdriver.
Mounting the cables cover
After all the cables are connected (
Please
refer to Page39 for Sub-Master BMS
and batteries cables connection and
Sub-
Master
BMS and inverter cables
connection
), push into the cables cover
from the right side.
Place stacked batteries and Sub-Master
BMS
Mounting the stackble fixed bar
Mounting the inverter
Install two stackable fixed bars on both
sides between battery modules, and
one on the left side between the battery
and Sub-Master BMS. Then secure with
screws to ensure the stability of the stack
structure.
Mounting the stackable fixed frame
Use two screws to secure.