background image

7

Maintenance

UV Lamps have a 

1 year (9000 Hour) life span

 under normal oper-

ating conditions.
Quartz sleeves should be cleaned with vinegar, citric acid, or a lime 

scale removing chemical annually, and replaced no less than once 

every 3 years. If the quartz sleeve can not be cleaned, or if it is dis-

colored, is must be replaced.    
Pre filters should be maintained according to the manufacturer's 

instructions to ensure feed water requirements within this manual are 

met.  

Parts List

ITEM QTY.

ORDERING CODE

DESCRIPTION

1a

1

UV CHAMBER 2.5" OD 2 GPM 3/8" MNPT FOR A SERIES

1b

1

UV CHAMBER 2.5" OD 6 GPM 3/4" MNPT FOR A SERIES

1c

1

UV CHAMBER 2.5" OD 8 GPM 3/4" MNPT FOR A SERIES

1d

1

UV CHAMBER 2.5" OD 12 GPM 1" MNPT FOR A SERIES

2a

1

7100169

UV QUARTZ SLEEVE FOR 2 GPM 330MM X 24.5MM A SERIES

2b

1

7100170

UV QUARTZ SLEEVE FOR 6 GPM 530MM X 24.5MM A SERIES

2c

1

7100171

UV QUARTZ SLEEVE FOR 8 GPM 680MM X 24.5MM A SERIES

2d

1

7100172

UV QUARTZ SLEEVE FOR 12 GPM 910MM X 24.5MM A 

SERIES

3

1

7300824

UV QUARTZ SLEEVE O-RING FOR A SERIES

4a

1

7100163

UV LAMP FOR 2 GPM A SERIES

4b

1

7100164

UV LAMP FOR 6 GPM A SERIES

4c

1

7100165

UV LAMP FOR 8 GPM A SERIES

4d

1

7100166

UV LAMP FOR 12 GPM A SERIES

5a

1

7300820

UV CONTROLLER ASSEMBLY FOR 2 GPM A SERIES USA 

120V PLUG WITH STRAIN RELIEF FOR QUARTZ SLEEVE NUT

5b

1

7300821

UV CONTROLLER ASSEMBLY FOR 6-12 GPM A SERIES USA 

120V PLUG WITH STRAIN RELIEF FOR QUARTZ SLEEVE NUT

5c

1

7300822

UV CONTROLLER ASSEMBLY FOR 2 GPM A SERIES EURO-

PEAN 220V PLUG WITH STRAIN RELIEF FOR QUARTZ SLEEVE 

NUT

5d

1

7300823

UV CONTROLLER ASSEMBLY FOR 6-12 GPM A SERIES 

EUROPEAN 220V PLUG WITH STRAIN RELIEF FOR QUARTZ 

SLEEVE NUT

6

2

7300049

UV MOUNTING CLIPS FOR 2.5" CHAMBER

7

1

7300825

QUARTS SLEEVE NUT 2 PIECE WITH GROUND ADAPTOR 

AND TEFLON WASHER

NOTICE

Summary of Contents for Pure Water SmartStream UV PWA002

Page 1: ...erty damage or damage to the equipment Keep this Manual for future reference WARNING Installation Precautions 2 System Specifications 3 Product Specification Tables 4 Dimensions 4 Feed Water Requirements 5 Installation Procedure 5 Installation Diagram 6 Maintenance 7 Parts List 7 Lamp and Quartz Sleeve Replacement 8 Disinfection Procedure 9 Troubleshooting 9 Warranty and Conditions 10 Table of Con...

Page 2: ...ream system Be certain that the feed water meets all criteria within the Feed Water Specifications section of this manual WARNING Installation Guidelines DO NOT allow this system to remain ON with out water in it for extended periods of time DO NOT install the system near any source of heat Also DO NOT install the system near any device or break out area that would be adversely effected by water D...

Page 3: ...stem requires servicing SmartStream UV System Part Number Identification Key Prefix PW Controller Series GPM Connection Type Pipe Size Plug Accessories Pure Water Controller Type A Controller A GPM of System 3 Digits Connection Port Types A NPT B BSP Tapered Pipe Size B 3 8 C 1 2 D 3 4 E 1 A North American 120V B European 220V Accessories X No Accessories Green Red LED Indicator System Features A ...

Page 4: ...Red LED AUDIBLE ALARM Yes AUDIBLE ALARM MUTE No MIN MAX AMBIENT AIR TEMPERATURE MAX HUMIDITY 32 F 0 C to 122 F 50 C 90 RH non condensing INLET WATER TEMPERATURE RANGE 36 F 2 C to 104 F 40 C MAX WATER PRESSURE 100 psi 689 kPa SHIPPING WEIGHT 4 6 lbs 2 1 Kg 6 4 lbs 2 9 Kg 8 lbs 3 7 Kg 11 lbs 5 Kg Dimensions A Series UV Systems Model GPM A B C D E F PWA002 2 1 1 14 17 17 65 3 83 3 09 14 PWA006 6 1 2 ...

Page 5: ...ith a paper towel 15 Loosen the Phillips set screw on the side of the quartz sleeve nut and separate the nut from the power cord 16 Install the quartz sleeve nut o ring onto the visible end of the quartz sleeve Screw the quartz sleeve nut onto the quartz sleeve port thread and tighten hand tight 17 Install the ultraviolet lamp into the quartz sleeve DO NOT touch the lamp with your fingers Hold it ...

Page 6: ...6 Typical Installation Diagram ...

Page 7: ...100170 UV QUARTZ SLEEVE FOR 6 GPM 530MM X 24 5MM A SERIES 2c 1 7100171 UV QUARTZ SLEEVE FOR 8 GPM 680MM X 24 5MM A SERIES 2d 1 7100172 UV QUARTZ SLEEVE FOR 12 GPM 910MM X 24 5MM A SERIES 3 1 7300824 UV QUARTZ SLEEVE O RING FOR A SERIES 4a 1 7100163 UV LAMP FOR 2 GPM A SERIES 4b 1 7100164 UV LAMP FOR 6 GPM A SERIES 4c 1 7100165 UV LAMP FOR 8 GPM A SERIES 4d 1 7100166 UV LAMP FOR 12 GPM A SERIES 5a ...

Page 8: ...artz sleeve into the reactor chamber Be careful not to force the quartz sleeve breakage may occur Then install the o ring over the quartz sleeve 9 Install the quartz sleeve nut onto the threaded port of the reactor chamber Screw the quartz sleeve nut on clockwise and tighten hand tight 10 Turn on the inlet valve and check for leaks Repair leaks as needed 11 Insert a new lamp into the quartz sleeve...

Page 9: ... connection Low pressure after system Clogged prefilter Replace prefilter Quartz sleeve nut leaks Quartz sleeve nut loose Tighten quartz sleeve nut O ring is defective Replace o ring All problem conditions called out within this troubleshooting chart require the disinfection procedure to be conducted after the corrective action has been completed NOTICE 1 Shut off the isolation valves on the cartr...

Page 10: ...ompany s published installation and operation manual product specifi cation sheet and local plumbing codes This product must be installed in connection with an approved water supply This product must be operated at water pressures and temperatures that do not exceed the Company s published specifications This product is limited to use within atmospheric environments indoors that are within ambient...

Reviews: