7
Filling OneFlow
®
Media
1. The 2.5" x 1.5" PVC coupling needs to be attached to the
non-notched end of the 1.5" PVC pipe as shown in Diagram A.
This keeps the pipe from falling into the tank.
2. With the distributor tube removed from the system, insert the
pipe into the tank and through the center of the mid plate as
shown in Diagram B.
3. Put media funnel into the top of the coupling as shown in
Diagram C.
4. Pour the new media into the funnel. Shake the funnel and pipe
to make sure all the media drops into the bottom chamber.
5. Remove the funnel and the pipe.
6. Reinstall the distributor tube and screen assembly by lowering
it through the mid plate and turning it clockwise as shown in
Diagram D with the notched end of the pipe. Remove the
1.5" pipe.
7. Proceed with Carbon replacement instructions.
Diagram C
Diagram D
Diagram A
Diagram B
Summary of Contents for E-Treat ETREATWCS
Page 12: ......