The following tables detail the recommended minimum valve servicing dimensions.
A
B
C
FLOW
FLOW
FLOW
D
FLOW
Valve Servicing Dimensions
IOM-A-ACV-985_685 2115
EDP# 1917102
© 2021 Watts 3
Commissioning Deep Well Pump Control
STEP 1
NOTE: System needs to be filled, pressurized, and ready for flow.
Pre-set pilots as noted:
Opening and Closing Speed
– Prior to pump start, actuate manual operator on solenoid to enable diaphragm assembly to stroke
open and closed. Observing the limit switch stem indicator, monitor rate of opening and closing speed. Adjust accordingly per applica-
tion requirements.
Note: Cycle diaphragm multiple times to confirm rate of movement and remove excess air trapped within the cover chambers (See
Figure 1 Below).
To increase the rate of opening/closing, turn the adjustment
screws on the speed controls OUT, counterclockwise. In decrease
the rate of opening/closing, turn the adjustment screws on the
speed controls IN, clockwise.
STEP 2
Prior to pump start, energize the solenoid to confirm connection
to power source.
STEP 3
De-energize the solenoid prior to initial pump start.
STEP 4
Energize the solenoid at pump start to close the main valve,
checking that the main valve closes.
Globe
Angle
Size (in)
2
21/2
3
4
6
8
10
12
14
16
20
24
A (in)
20
22
22
24
32
34
38
44
48
52
56
56
B (in)
20
22
22
25
36
38
40
44
48
50
50
50
Size (in)
2
2
1/2
3
4
6
8
10
12
14
16
C (in)
20
22
22
24
32
34
38
44
48
52
D (in)
20
22
22
25
36
38
40
44
48
50
Figure 1
4-Way Solenoid
Manual
Operation
Normal
Operation