background image

10          IOM-A-ACV-950-15_650-15   2115 

EDP# 1917072 

© 2021 Watts

IOM-A-ACV-950-15_650-15   2115 

EDP# 1917072 

© 2021 Watts         11

NOTES

Summary of Contents for AMES 650GD-15

Page 1: ...e Rate of Flow Controls 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica tions to the informati...

Page 2: ...ator can be installed to provide visual indication of valve position and operation without disassembly 3 Install isolation valves upstream and downstream of the main valve 4 Provide adequate clearance...

Page 3: ...the valve See Figure 1 STEP 4 Pressure the line by opening the upstream isolation valve slowly Air is vented through the air bleed valve Tighten the fitting when liquid begins to vent See Figure 1 Re...

Page 4: ...trol allows free flow into the cover and restricted flow out of the cover of the main valve If valve opening is too slow turn the adjustment screw OUT counterclockwise increasing the rate of opening S...

Page 5: ...specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphragm...

Page 6: ...isolation valves ensure open Diaphragm is damaged Conduct diaphragm seal test repair and replace if necessary Main valve stem assembly corroded damaged Inspect stem assembly clean replace if necessary...

Page 7: ...move cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may require...

Page 8: ...rush or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are thread...

Page 9: ...uts in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integri...

Page 10: ...ess Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 13 Seat Disc Buna N Nitrile 14 Spac...

Page 11: ...IOM A ACV 950 15_650 15 2115 EDP 1917072 2021 Watts 11 NOTES...

Page 12: ...resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no cont...

Reviews: