CHECKOUTS

Connected all system voltage phases in the right order

Connected the CTs and verified their mappings to their 
respective phases

Connected the internal Ethernet cable from the Wattch 
Edge Controller, and any external Ethernet devices, to 
the Digi modem

SENSOR INSTALLATION

PLANE OF ARRAY

Mount in the same orientation as the array. Place the sensor near the 
geometric center of the array if possible, or at the end of a row near the 
center of the array. Ensure that there are no objects that could shade the 
sensor at the beginning or end of the day when the sun is low.

Mount the face of the sensor flush with the array so that the sun hits the 
sensing element at approximately the same time as the cells. DO NOT install 
sensors in a location where they are meaningfully more or less shaded than 
the array.

GLOBAL HORIZONTAL IRRADIANCE

Ensure that the sensor is not shaded at any point during the day and is 
perpendicular to the Earth’s surface. Some sensors, such as the Hukseflux 
SR05-D1A3, come with a ball level built in to the chassis to make flat 
installation easier.

BACK OF MODULE TEMPERATURE

While the optimal location will vary from project to project, we recommend 
placing this sensor near the geometric center of the array.

AMBIENT TEMPERATURE

Make sure that the shroud is installed correctly and that the sensor is far 
from any water sources.

Installed the antennas as shown on the opposite page

If required, connected all RS-485 connections

Torqued all connections to the proper specifications

Installed the batteries according to the guide on the 
opposite page

IMT

HUKSEFLUX

KIPP & ZONEN

BEFORE powering the DAS, verify that you have:

Torque these connections to 4.5 in-lb. The shield should be 
terminated to ground only at the DAS side.

POWER UP

Flip the AC breaker to the ON position. Ensure that the DC 
OK light on the power supply (top left) is 

green

, and that the 

LEDs on all of the components are lit according to the below 
guidelines. Some of the LEDs are difficult to see in sunlight.

•  Modem: PWR 

cyan

, SIM 

blue

, LTE 

blue

•  Wattch Edge Controller: PWR 

green

•  Meter: P1-P3 LEDs blinking 

green

 or red

•  DUPS40 UPS: DC OK LED on

Flip the I/O breaker to the ON position and then flip the UPS 
breaker to the ON position.

TRIMMING

The system must be powered up via AC in order to perform this 
step, and the UPS breaker must be turned on as well.

The power supply needs to be trimmed to 27.0 V ±100 mV to 
fully charge the batteries. While measuring the voltage on the  
DC terminals of the power supply with your multimeter, use 
the Phillips screwdriver to slowly trim the voltage using V ADJ 
to the correct voltage.

Be extremely careful NOT to exceed 28V.