background image

Q

CABINET WALL

HOT TANK UNIT

(SIDE VIEW)

1.

12”

2.

3.

4.

V

R

S

U

T

Slide nut (R) onto 
center Hot Tank tube 
(S), threads up. Slide 
on tapered collar (T). 
Slide on 2 orange 
O-rings (U). Position 
stack of components on tube so that 
O-rings are even with top tube. Hold nut 
in place and thread connector body (V) 
onto nut until snug.

Find a location under your sink that has access 
to an electrical outlet and close enough to 
reach faucet tube leads without kinking. For the 
tank to operate properly, it cannot be installed 
beyond the reach of the factory tubing.

Install hanging bracket (Q) to 
cabinet wall. Make sure top 
edge of bracket is at least 12” 
from bottom of cabinet.

Mount tank on hanging 
bracket as shown.

HOT TANK INSTALLATION

CHOOSE TANK LOCATION

INSTALL BRACKET

MOUNT TANK

CONNECTOR INSTALLATION

WARNING! DO NOT PLUG IN THE 

HOT TANK UNTIL IT IS FILLED WITH 

WATER. HEATING THE TANK WHILE 

EMPTY WILL DAMAGE UNIT

Reviews: