4
Installation Requirements
A level floor position ahead of piping into water heater
Unit must be installed at least 10 feet ahead of the inlet to a water heater to prevent damage due to back-up hot water.
DO NOT install the unit in an area of direct sunlight or where freezing temperatures may occur!
Locate the unit near an unswitched, 120 volt / 60 Hz grounded electrical outlet.
Check for distance and proper drain installation (e.g. floor drain, washing machine standpipe).
Determine type and size of piping required for filter connection (e.g. copper, galvanized, PVC plastic).
Note:
If household plumbing is galvanized and you intend to make the installation with copper (or vice versa), obtain
di-electric unions to prevent dissimilar metal corrosion.
Caution:
If sweat soldering copper pipe (remember to always use lead free solder and flux), cover yoke and bypass valve
with wet rags to prevent heat damage to connections and control valve. If using PVC or plastic pipe, primers and
solvent cements specifically recommended for use with potable water are required.
Note:
All plumbing lines not requiring “soft” water should be connected “upstream” of the softener, if installed.
(See Typical Installation Diagrams.)
Installation
Summary of Contents for ISOBAR II
Page 1: ...Installation Operation Manual...
Page 18: ...18 Valve Body Drive Assy...
Page 25: ...25 Warranty...
Page 26: ...26...
Page 27: ...27...