Selecting the Site and Unpacking
17
2
2 Installation
This chapter covers the necessary procedures for installing the Bus SAT/IN module.
2.1 Selecting the Site and Unpacking
Selecting the site
Install the Bus SAT/IN module in an area where:
• The Bus SAT/IN module is up to 4, 8, 16, 32 or 64 meters from the Bus LAC/E I/O
Distribution Box, depending on the length of the serial cable. (The startup kit
contains an 8 m cable. See
Appendix B, Spare Parts
for part numbers for other
cable lengths.)
• The Bus SAT/IN module is up to two meters (maximum analog cable length) from
the detectors to which it is to be connected.
• Bench space is approximately 9 inches wide by 12 inches deep by 4 inches high (23
centimeters by 30.5 centimeters by 10.5 centimeters).
Note:
Do not stack heavy devices on top of the Bus SAT/IN module.
• Temperature is 50 to 95 °F (10 to 35 °C).
• Relative humidity is 20 to 80%, non-condensing.
• Vibration and shock are negligible.
Caution:
To avoid chemical hazards, always observe good laboratory practices when
handling solvents and performing maintenance.
Power requirements
The Bus SAT/IN module draws power from a table-model, regulated power supply. See
Appendix A, Bus SAT/IN Module Specifications
for power supply specifications.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com