Waste port for blue PEEK tubing (standard divert mode configuration only)
Waste port for blue PEEK tubing (loop injection configuration only)
Mounting bracket drip tray
Drip tray Tygon waste tubing spur
2.
Use the PEEK fitting to screw one end of the blue PEEK waste tubing to the diverter valve
until finger-tight.
Note:
Fit the blue PEEK waste tubing to port 1 in divert mode configuration. Fit the tubing
to port 5 in loop injection configuration.
See also:
Configuring the diverter valve fluidics
3.
Cut the Tygon tubing and the blue PEEK tubing to the required lengths and feed these into
a suitable waste collection vessel, using Y-pieces supplied with the ACQUITY Diverter
Valve Assembly Kit for teeing in the tubing as required.
E.3 Operating the ACQUITY Diverter Valve
E.3.1 Programming the diverter valve for operation
You can actuate the diverter valve by manually switching the valve positions using the buttons on
the front panel, by using method events to program the valve operation, or by a combination of
manual switching and programmed operation. You can configure any combination of ON/OFF
method events.
Note:
Configure the method events in the Events table of the QDa Method Events Editor.
Tip:
Add a toggle switch command to the first line in the method events table, immediately
followed by the required valve starting position, to ensure that the flow switches automatically to
the correct valve start position when resuming programmed operation after manual actuation.
Table E–1: Method events for programmed operation
Command
Valve function
ON
Valve moves to, or stays in, position 1 (Flow to QDa).
OFF
Valve moves to, or stays in, position 2 (Flow to waste).
Toggle
Valve moves to the opposite of the current position.
Notes:
June 15, 2017, 715003956 Rev. F