background image

715001213, Rev. B

2 of 5

Connecting Your Detector

For detailed installation information and cautionary statements regarding this product, refer to the 

following documents:

ACQUITY Evaporative Light Sattering Detector Operator’s Guide (71500109303)

Ethernet Instrument Getting Started Guide (71500074403)

Installing System Leak Sensors (715001557)

ACQUITY UPLC Leak Sensor Maintenance Instructions (71500082506). This document is an 

addendum to the ACQUITY UPLC System Operator’s Guide.

Electrical Connections

A. Connect any required event or signal cables.
B. Connect an Ethernet cable from the detector to the 

system LAN switch or to the 

network card on the acquisition computer.

C. Connect the power cable to a grounded receptacle.

B

A

Signal Out +

Signal Out  –

Ground

Auxillliary Out +

Auxillliary Out –

Stop Flow +

Stop Flow -

Ground

Switch 2 +

Switch 2 -

 1
 2
 3
 4
 5
 6
 7
 8
 9
10

Inject Start +

Inject Start –

Ground

Lamp On/Off +

Lamp On/Off –

Chart Mark +

Chart Mark –

Ground

Auto Zero +

Auto Zero –

A

B

Ethernet 

Cable

441000372

 or

441000456

C

Fuse - WAT163-16 (if equipped)

Range: 110 Vac to 240 Vac

Gas Connection

Figure 1 - ACQUITY ELS Rear Electrical and Gas Connections

110 V - WAT097194
220 V - WAT097410

Gas Exhaust

Reviews: