background image

STEP THREE

Place the Tank Assembly between the Rails. 

STEP FOUR

Place the Footboard between the Rails positioning the top two holes over 

the two threaded holes in the back Tank Unit. Screw the Handle Rests into 

position using the Handle Rest Bolts, do not over tighten.  It may be necessary 

to slightly loosen the two bolts on the Top Deck (A) to allow the Footboard 

clearance.

                                                                    A
                                                                     

STEP FIVE

Insert the JCN Nuts and JCB Bolts attaching the Tank and the Footboard to the 

Rails at A & B. The Nuts should be placed on the inside and the Bolts on the 

 

outside. Should you experience any problem with aligning the components, 

loosen all the fasteners, align and re-tighten.

Handle Rest Bolt

Handle Rest

JCN Nut

JCN Bolt

A

B

STEP SIX 

Press the Heelrest Adjustment Button (A) and insert the Heelrest/Footpads 

into the Footboard Cover Plate (B).

STEP SEVEN

Undo the Dolley Wheel Assembly and fix to the Rail in the order shown and 

tighten. Note - the Wheel goes on the outside of the Rail.

A

B

B

A

Reviews: