![Waterra Waterra PowerPack PP1 Manual Download Page 12](http://html1.mh-extra.com/html/waterra/waterra-powerpack-pp1/waterra-powerpack-pp1_manual_3646967012.webp)
PUMPING OPERATION
! WARNING
Read and understand the Safety Instructions on pages 4 to 8 before operating the PowerPack. If you
notice any abnormal sound, smell or vibration, or other unusual signs, stop the motor immediately and
consult Waterra.
Basic operation
These instructions assume the inertial pump tubing has already been installed into the borehole and
the PowerPack fuel tank has been filled.
Before use, remove the PowerPack from the backpack frame if used.
When pumping from a borehole with protective headworks or where the borehole lining is raised
above ground level:
1.
Lift PowerPack and hook onto the lip of the borehole lining
or headworks (see picture).
2.
Take the strap around the circumference of the borehole
lining or headworks and pass it through the ratchet slot.
Pull tightly to remove slack (see picture).
3.
Operate ratchet arm backwards and forwards until the
strap is fully tightened.
4.
Check that the clamping strap is securely attached by
trying to lift the PowerPack vertically.
5.
Re-tighten the strap until the PowerPack is secure
6.
Ensure the tube clamp is positioned over the centre of the
borehole.
w
PP1
12
Summary of Contents for Waterra PowerPack PP1
Page 22: ...w PP1 22 NOTES...