![Watermark Xsential QUAD-RO Installation And Maintenance Manual Download Page 5](http://html1.mh-extra.com/html/watermark/xsential-quad-ro/xsential-quad-ro_installation-and-maintenance-manual_3648138005.webp)
9.0 INSTALLATION OF AX10-TS TRIPLE ACTION SYSTEM
1. Mark the bracket holes of the triple action system.
2. Drill and screw the screw into the drilled holes.
3. Hang the system on the screws.
10.0 INSTALLATION OF STORAGE TANK
NOTE: PRESSURE ADJUSTMENT IS NOT REQUIRED as the storage tank is shipped with pressurised air.
1. Remove the black plastic cap on the bottom of the tank.
2. Tape the 3/8” male end of the cone reducer (item Q) with Teflon tape.
3. Tighten the 1” to 3/8” cone reducer (item Q) to the storage tank (hang tight only).
4. Tighten the 3/8” feed water ball valve to the reducer.
5. Measure the distance between the storage tank and the R.O. system.
6. Cut a 3/8” poly tubing with the length measured.
7. Unscrew the ball valve screw from the storage tank.
8. Insert the 3/8” poly tubing into the nut and tighten the screw to the ball valve (item P in Diagram 1).
9. Insert the other end of the tube to the position marked
Tank
on the Quad
RO
10. Turn on the ball valve (blue handle should be parallel to the tube)
11.0
CONNECTING UP THE APPLIANCE
1. Screw the ¾” connector with 3/8” tube reducer on to both water inlets of the appliance
2. Measure the distance between the appliance and the QuadRO system and cut a 3/8” poly tubing with the length
measured.
3. Connect the tubing to the Quad
RO
at the position marked
APP
(location F in diagram 1).
4.
Do not
connect it to the steamer oven/coffee machine/appliance at this stage.
12.0
CONNECTING
UP
FEEDING
WATER
1. Measure
the
distance between the water feed valve and the R.O. system
2. Cut a 3/8” poly tubing with the length measured
3. Insert the tube to the connector B as shown in diagram 1.
4. Insert the other end of the tube to the 3/8 tube union tee adapter (item C in diagram 1)
5. Insert one end of the union tee connector to the inlet of the Triple Action System (item M) as shown in diagram 1
6. Insert a tube to the outlet of the Triple Action System (item M).
7. From the outlet of the Triple Action system (item M), insert the other end of the tube to the RAW water inlet of the
appliance.
8. From the 3/8” union tee connector, insert the tube into the 3/8” OD ball valve of the Quad
RO
system (item D) as
shown in diagram 1
13.0 START UP PROCEDURE
1. With the tube that is connected at the position marked
APP
(location F in diagram 1), move the end of the tube to the drain
cup.
2. Turn on water supply slowly.
3. Check for leaks. (If anything is leaking shut off water, repair, then start with step 1 again.
4. Within a few minutes (up to 10 minutes) the water will start to flow from the tube connected at the position marked
APP
.
5. Let the water run for 15 minutes. This flushes out the preservative in the membrane.
6. Turn off the water supply.
7. See Section 14 if you wish to adjust the TDS/water hardness of the water.
8. Insert the end of the tube that is connected at the position
APP
into the soft water inlet of the appliance.
9. Turn on the water supply - the tank will take about 1-2 hours to fill up (depending on the size of the tank and water pressure).
14.0 ADJUSTING THE TDS (TOTAL DISSOLVED SOLID) OF THE WATER
Note: A TDS tester and water hardness test kit is required for testing the water hardness. The TDS tester is used as a guide only.
The water hardness test kit will be required to test the final hardness of the water. The default set up for the system is to reject up
to 96% of the impurities in the water.