
5
www.waterloo.co.uk
Tel: +44 (0) 1622 711500
Operating and maintenance instructions
Figure 4
Figure 5
Figure 6
ABM Active Chilled Beams
&OLSWKHKDQJLQJEUDFNHWWRWKHKDQJLQJUDLO
)LJXUH
)LJXUH
). Offer the beam up to the rod suspended
IURPWKHFHLOOLQJDQGVHFXUHZLWKEROWV
)LJXUH
)
'XFWZRUN&RQQHFWLRQ
Ducts must be connected to spigots by means of duct
WDSH7KH\PXVWQHYHUEHVFUHZHG0DNHVXUHWKDWWKH
entire spigot surface area is covered. Push the duct as
far as possible onto the spigot towards the unit to get
the best air tightness.
Circular connection ø 100mm
2400 3000
Circular connection ø 125mm
ø 100
ø 125
+DQJLQJ
point rail
Clip
EUDFNHW
to unit