BLUPURA
Fizz 80
Manual
Page 24 ‐ Revision: 11‐2‐2018
20.
System should be chilled about 60 minutes later.
21.
Dispense ½ Gallon of water from the sparkling tap, once system is chilled.
22.
Allow to refill.
23.
Unit is ready for use.
NOTE:
Complete Chilling of Ice Bank takes 1‐3 Hours.
INSTALLING OF C02 CYLINDER
WARNING!
Always connect C02 gas cylinder to a reducing valve or regulator. Failure to do so could
result in an explosion with possible death or injury when the cylinder valve is opened.
WARNING!
Always secure gas cylinder in upright condition and away from heat.
NOTE:
Installation of C0
2
cylinder can only be done once the unit is connected to supply water
(feed water), has power and the ice‐bank tank has been filled.
24.
Connect the cylinder through the pressure regulator to the
C0
2
Inlet Pipe.
25.
To increase the level of carbonation of the water, adjust the
screw by turning clockwise increases the level of carbonation.
We recommend that you do not exceed 4 bar (60 psi) of
pressure.