10
Notes
1
Content
Applications
9
Electrode Replacement
8
Battery Replacement
Measurement
7
Calibration
6
Preparation
5
Accessories
Device Description
4
Specification
3
Features
2
Introduction
Page 1: ...been inspected and tested in accordance with the published speci cations The instrument has been calibrated by using equipment which already calibrated to standards traceable to international standard...
Page 2: ...Notes 1 Content Notes 10 Applications 9 Electrode Replacement 8 Battery Replacement 8 Measurement 7 Calibration 6 Preparation 5 Accessories 5 Device Description 4 Speci cation 3 Features 2 Introductio...
Page 3: ...resistant ABS case by waterproof designed IP 57 rated 2 points manual calibration via screw trim pot Automatic temperature compensation ATC The electrode module can be easily changed by users The met...
Page 4: ...he meter will turn o automatically in 3 seconds after being turned on 2 Loosen the battery compartment counterclockwise 3 Replace the fresh Lithium battery CR2032 and note polarity 4 Replace the batte...
Page 5: ...ent rinse the electrode with clean water and replace the soaking bottle and protective cap The soaking bottle should be always kept wet by adding soaking solution Note 1 When doing a 2 points calibrat...
Page 6: ...25 by turning the trimmer Span located at left side of battery compartment with a screwdriver 5 6 Accessories Upon receiving the shipment inspect the container and equipment for any signs of damage Re...