background image

10

ENVISION POOL HEATER INSTALLATION MANUAL 

NO

TES:

1. 

Use only c

opper c

onduct

ors.

2. 

C

onnect field wiring in gr

ounded r

ain-tight c

onduit, 

per r

a

ting plat

e

.

3. 

C

onnect bond wir

e t

o pool s

teel using #8 solid 

c

opper wir

e or lar

ger

.

4. 

All wiring mus

t c

onf

orm t

o national (NEC) and local 

electrical c

odes.

2 - Only on 080 models. 

Factory low voltage wiring

Switch -High pressure

Switch -Low pressure

Relay coil

Field wire lug

Ground

Relay Contacts -

N.O., N.C.

Polarized connector

Notes:

Factory line voltage wiring

Field low voltage wiring

Field line voltage wiring

Optional block

Quick connect terminal

Wire nut

Screw terminal - field connection

CC - Compressor contactor

HP

 - High pressure switch

LP

 - Low pressure switch

Fan - Fan relay

L1

1

3

2

P

FS1 - Flow Switch 1

Capacitor

FS2 - Flow Switch 2

DC - Defrost Cycle

WT

 - W

ater 

Temperature

T

Thermistor

RM - Remote 

Automation 

Mi

c

ro

p

ro

c

e

s

so

r C

o

n

tr

o

l

TE

S

T

PI

N

CC

HP

LP

DC

WT

FS

1

FS

2

F

iel

d I

ns

tal

le

d F

low

 

Sw

itc

h.

 

S

ee T

a

bl

1.

Re

m

o

te

 A

u

to

m

at

io

n

 J

u

m

pe

r

P1

P2

P3

PI

N 1

2

3

F

iel

d I

n

st

al

le

d h

o

m

a

u

to

m

a

tio

n c

on

tr

o

l.  

S

ee 

Ta

b

le

 1

.

Se

e T

abl

e 1

Fa

n1

In

ter

face P

an

el

9

10

11

12

TS

4

Gr

ee

n

7

8

1

2

TS

3

4

5

6

24

LP

LP

HP

HP

CC

CC

G

F2

F1

C

PI

N 1

X3

X3

X2

X2

X1

X1

WA

T

WA

T

FP

FP

Co

m

pr

esso

r

Un

it

Po

we

r Su

pp

ly

208-

230/

60/

1

CC

T1

L1

T2

L2

G

C

R

S

RB

Fa

n M

ot

or

2

4

Tr

ans

for

m

er

24V

Bl

ac

k/

W

hit

e

Ye

llo

w

Bl

ue

230 V

Bl

ac

k

Co

m

PS

C

D

A

Re

d

208 V

Bl

ac

k

Bl

ue

Br

ow

n

Bl

k/W

ht

Vi

ol

et

Bl

ac

k

Bl

ac

k

Bl

ue

Bl

ue

Red

Bl

ac

k

Ye

llo

w

Vi

ol

et

Vi

ole

t

Or

an

ge

Or

an

ge

Gr

ay

Gr

ay

P5

1

Br

ow

n

Ca

p

Cap

No

t Us

ed

Ye

llo

w

Bl

ac

k

Gr

ee

n

Bl

ac

k

Br

ow

n

Or

an

ge

Bl

ue

Re

d

Bl

ac

k

Bl

ue

Bl

ue

Re

d

Re

d

Bl

ac

k

Bl

ac

k

Re

d

Bl

ac

k

Cr

an

kc

as

He

at

er

Bl

ac

k

Bl

ac

k

Or

an

ge

No

te

 1

1 - Only on 105 models. 

PT

CR

No

te

 2

Ye

llo

w

Bl

ac

k

T

able 1 - Jumper Configurations

Application

Pool/Spa (1 V

alve)

Pool/Spa (2 V

alve)

Remote Automation

Jumper Setting

1 & 2

2 & 3

3 & 4

Legend

97P675-01      12/1/09

230/60/1

Wiring Schematic

Summary of Contents for Envision

Page 1: ...Installation Information Water Piping Connections Chemical Use Electrical Startup Procedures Preventive Maintenance Troubleshooting IM1009PN 04 13 Envision Pool Heater Installation Manual Pool Heater...

Page 2: ......

Page 3: ...llation 5 Dimensional Data 6 Physical Data 6 Water Flow and Connections 7 Chemical Use 7 Electrical Connections 8 Electrical Data 8 Electronic Control Panel 9 Modes of Operation 9 Wiring Schematic 10...

Page 4: ...T Titanium Rev 18 April 2013D Performance Data Model GPM High Ambient Low Ambient EWT 80 F EAT 80 6 70 7 F EWT 80 F EAT 50 44 2 F Capacity BTUH COP Capacity BTUH COP 0750 22 50 000 6 0 31 000 4 0 110...

Page 5: ...consumes in electrical power In addition it will still warm your pool even as outdoor temperatures drop into the 40s The information in this manual was prepared to assist in the proper installation o...

Page 6: ...0 32 9 24 5 38 0 26 0 2 ID PVC UNION 1100 1750 32 9 32 5 38 0 34 0 2 ID PVC UNION 04 11 13 NOTE All dimensions are in inches Physical Data Model 0750 1100 1250 1500 1750 Compressor Reciprocating Scrol...

Page 7: ...ain Skimmer Check Valve Chlorine Gas Trap Ball Valves Filter Pump In Out Heat Pump Pool Heater Heat Pump Pool Heater In Out Pump Filter From Main Drain Skimmer Return Ball Valve For Flow Rates Greater...

Page 8: ...ht seal extending the life of the heater 4 Attach grounding conductor to the ground lug provided inside the electrical control enclosure 5 Install L1 and L2 input conductors to the input lugs of the c...

Page 9: ...inal strip and install the remote control system The mode jumper must be on pins 3 4 for this mode of operation See the Terminal Strip and Mode Configuration Pins illustration for pin settings 4 3 2 1...

Page 10: ...Remote Automation Microprocessor Control TEST PIN CC HP LP DC WT FS1 FS2 Field Installed Flow Switch See Table 1 Remote Automation Jumper P1 P2 P3 PIN 1 2 3 Field Installed home automation control See...

Page 11: ...conductive A pool cover solar blanket may reduce initial heating time by up to 50 Defrost Cycle The heat pump pool heater has automatic defrost When the outdoor temperature drops below 40 F frost may...

Page 12: ...breakers or replace fuses if necessary 2 Check to be sure the electronic control panel is set properly The unit must be in either the POOL or SPA mode and the desired temperature must be set above th...

Page 13: ...13 ENVISION POOL HEATER INSTALLATION MANUAL Notes...

Page 14: ...e By 4 Added Nomenclature 19 Apr 2013 DS 4 Added Performance Data 19 Apr 2013 DS 6 Added Dimensional and Physical Data 19 Apr 2013 DS 8 Updated Electrical Data 19 Apr 2013 DS 15 Added New Warranty 19...

Page 15: ...of the unit D Malfunction or damage due to negligence abuse freezing conditions accident or acts of God E Malfunction of damage from plants or animals F Malfunction or damage from the attachment of a...

Page 16: ......

Page 17: ...llation Do not mail the warranty certi cate Mail To WaterFurnace International Inc 9000 Conservation Way Fort Wayne IN 46809 9794 Fax To 800 934 9934 Is Pool Covered Yes No Circle One Is Pool Screened...

Page 18: ......

Page 19: ......

Page 20: ...l Inc 9000 Conservation Way Fort Wayne IN 46809 www waterfurnace com 2013 WaterFurnace International Inc 9000 Conservation Way Fort Wayne IN 46809 9794 WaterFurnace has a policy of continual product r...

Reviews: