![Water Factory Systems 40T Owner'S Manual Download Page 6](http://html1.mh-extra.com/html/water-factory-systems/40t/40t_owners-manual_3545884006.webp)
Set Up (Continued)
4) Install the Reverse Osmosis Cartridge:
a) Remove reservoir lid and set aside.
b) Holding the unit with both hands by the shroud, turn it upside down with the two base screw
knobs facing up.
c) Using both hands, loosen the two base screws completely by turning to the left at the same time
(see drawing below). This releases the base from the shroud.
d) Holding both the base and the shroud together, turn the appliance right side up.
e) To expose cartridge compartment, carefully lift shroud just above base and tilt away from you
onto the counter. Be careful not to pull tubing loose.
f) Remove new RO cartridge from it’s sanitary sealed wrapper.
g) Remove the plug from drain connection on the RO cartridge.
h) Using tap water, wet the o-ring seals to make insertion easier. Slide the filter cartridge into the
retaining clip.
i) Line up the ears, insert cartridge, and push into cartridge head until fully seated. Twist the
cartridge 1/4 turn to the right to lock into place.
j) Insert black tube into drain connection on new RO cartridge.
k) Carefully lift shroud and fit over base, making sure not to kink or twist tubing.
l) Holding both the base and the shroud together, turn the appliance upside down.
m) Using both hands, tighten the two base screw knobs by turning to the right at the same time.
n) Turn the appliance right side up.
5