Start-Up Procedure 



Fill the mineral tank with water: 

Press and hold the extra cycle button for 5 seconds. Dis-

play will indicate step 1, which is the backwash cycle (as shown above). Once the display 
indicates step 1, slowly open bypass valve and let water run to the drain for approximately 5 
minutes. This will bleed any air from the system and flush it to the drain. After approxi-
mately 5 minutes, manually index the valve through the remaining cycles as follows: 



Push the extra cycle button 

once to advance the valve to regen step 2 



Push the extra cycle button 

once to advance the valve to regen step 3 



Push the extra cycle button 

once to advance the valve to regen step 4 

 
At regen step 4, allow the control to automatically complete step 4 (brine refill) and return to 
service. This will place the correct amount of water in the brine tank for start-up.  
 
The unit is now pressurized with water and ready for service

.  

 
Proceed to setting current time of day. 

 

Placing unit into service 

Summary of Contents for Brassmaster

Page 1: ...Combination Water Softener Tannin Filter Installation Operation Manual ...

Page 2: ...le threaded opening on the back side of the control valve Connect 5 8 drain line supplied in parts bag to barbed end of drain line fitting and run to a nearby drain Be sure not to submerse drain line end into drain as an 1 1 2 mini mum air gap must be maintained to prevent potential backflow hazard Firmly secure at drain while maintaining a minimum 1 1 2 air gap See detailed drawing on back side o...

Page 3: ...minutes manually index the valve through the remaining cycles as follows Push the extra cycle button once to advance the valve to regen step 2 Push the extra cycle button once to advance the valve to regen step 3 Push the extra cycle button once to advance the valve to regen step 4 At regen step 4 allow the control to automatically complete step 4 brine refill and return to service This will place...

Page 4: ...rride setting This ensures regular regeneration periods In areas of heavy iron water conditions this setting should not exceed 5 days Setting Current Time Day 1 Press either the Up or Down buttons to adjust current time of day by one digit Push and hold either up or down set button to adjust current time of day display by several digits Start Up Procedure Abbreviation Parameter Description DO Day ...

Page 5: ... this setting This will deter mine the amount of water usage allowed between regeneration cycles 5 Set Fixed Reserve Capacity Press the Extra Cycle button to advance to next option Set the Fixed reserve capacity for the household This is the amount of water needed in reserve to reach the delayed regeneration time Standard setting is 50 gallons for each person in the household Start Up Procedure Af...

Page 6: ...en this procedure is performed with the bypass closed it will relieve any water pressure on the unit Remove the stainless steel retainer pins at the base of the module loosen the clips at the bypass valve and disconnect the drain line and brine line The module will now completely separate from the tank Please contact your dealer or Water Control Corporation for module support Nearly all serviceabl...

Page 7: ...AIMS ANY AND ALL OTHER WARRANTIES EXPRESS OR IMPLIED INCLUDING THE WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE WHAT IS NOT COVERED BY THESE WARRANTIES 1 Conditions and damages resulting from any of the following Wear caused by unfavorable water conditions Improper installation delivery or maintenance Any repair modification alteration or adjustment not authorized by the manu...

Page 8: ...Water Control Corporation 7150 143rd Ave NW Ramsey MN 55303 Phone 1 866 405 1268 Fax 763 427 5665 www watercontrolinc com ...

Reviews: