6
User programming (cont’d)
Control programming is now complete. Press the extra cycle button and the control will
exit from the programming mode and resume normal operation.
3.
Adjust Regeneration Time:
Press the Extra Cycle button to advance to next option. This
setting determines the time of day that the unit will enter the regeneration cycle. The most
common / default setting is 2:00 AM. If additional equipment is installed, ensure the regener-
ation times are offset by a minimum of 2 hours.
4.
Set Water Hardness:
Press the Extra Cycle button to advance to next option. Set the hard-
ness of the incoming water (Grains per Gallon). For each PPM of iron, add 4 Grains per Gal-
lon to this setting. This will determine the amount of water usage allowed between regenera-
tion cycles. NOTE: If combined Nitrite levels exceed 50 PPM, contact Water Con-
trol for additional setpoint instructions.
5.
Set Fixed Reserve Capacity :
Press the Extra Cycle button to advance to next option. Set
the Fixed Reserve Capacity for the household. This is the amount of water needed in reserve
to reach the delayed regeneration time. Standard setting is 50 gallons for each person in the
household.
Start-Up Procedure
After complete installation of unit, dilute 1/2 cup of unscented laundry bleach in 3 gallons of
water, and add to brine tank. Initiate a manual regeneration by depressing the extra cycle but-
ton. Allow the unit to complete its cycle and advance to the “Service” position. The unit is now
sanitized and ready for operation.
Sanitization of Unit