Installation
2
0243
Installation
The machines are free-standing, i.e. the drum
can move relative to the frame of the machine.
This results in a considerable reduction in vibra-
tion transferred to the frame which in turn
simplifies installation: no special foundation is
required.
The machine is delivered complete with expan-
sion bolts, template etc. packed inside the drum.
Move the machine on its pallet to where it is to be
installed before removing the pallet retaining
bolts.
Location
Install the machine close to a floor drain or open
drain.
In order to make installation and servicing the
machine easier the following clearances are
recommended:
•
At least 20" between the machine and the wall
behind
•
and a minimum of 2" on both sides of the
machine whether installed next to the wall or
other machines.
Where space is limited it is possible to reduce
this distance to a minimum of 1" at the rear and
sides, since most service operations are carried
out from the front or top of the machine.
Floor
The floor must be able to withstand the following
loads:
EX7
EX10
static
390 lbs
550 lbs
dynamic
170 lbs
220 lbs
frequency of
17 kHz
17kHz
dynamic force
5
20"
2"
Fig.
2