background image

 

 

WÄRTSILÄ JOVYCUBE 160 

BAX 5157 

 - 13 -

 

3  Installation 

Remove  the  packaging  immediately  after  receiving  the  UPS  and  check  the  system  for  transport 
damages. The transport company must be informed immediately after receipt of the UPS in the event 
of any damage caused during transportation. If the UPS is not installed immediately it must be stored in 
an upright position as indicated on

the packaging and kept in a dry, well ventilated room. If the UPS is 

not stored in the original packaging, it must be protected from dust and moisture. 
 

3.1 

Installation 

The UPS must be set up in a clean,  dry, dust-free room. The operator must ensure that the room is 
adequately  ventilated,  so  that  the  system  is  sufficiently  cooled  and  overheating  is  prevented.  Please 
observe the set-up diagram in the appendix. If the UPS is supplied with built-in batteries, the exchange 
of air with the external environment must be in accordance with EN 62040, appendix N. 
 

3.2 

Electrical connections, cross sections, fuses 

The electrical connection of the UPS unit is the task of the electrician providing the electrical installation 
services.  This  task  is  not  carried  out  by  the  UPS  manufacturer.  For  this  reason,  the  following 
recommendations are only an indication, as the UPS manufacturer is

not responsible for the electrical 

installation. 
 
In  all  cases,  we  recommend  installing  and  connecting  the  input  and  output  in  conformity  with  local 
regulations and standards. 

In particular, take care to ensure a clockwise rotation phase sequence 

during electrical installation.

 If no error message is generated, the Jovycube will also operate with an 

anti-clockwise rotating field, and this may result in destruction of the UPS/modules if the manual bypass 
is used. In the event that strong electromagnetic fields are emitted, we recommend the use of shielded 
cables between the UPS and the load. 
 

ATTENTION: 

Even when the mains voltage is switched off there is a dangerously high battery voltage 
inside the device. All installation and connection work may therefore only be carried out 
by a qualified electrician. Before commencing work, electricians must read this manual 
carefully  to  familiarize  themselves  with  the  special  features  of  this  UPS  unit.  The  UPS 
output still carries voltage even in the event of a mains failure. For this reason, the installer 
must clearly label the outlets and sockets on the UPS unit in accordance with EN 62040! 

 

ATTENTION: 

The input line between the mains and the UPS unit must be protected against short 
circuits! 
The use of FI safety switches before the UPS unit is not recommended. 

 

 

Summary of Contents for JOVYCUBE 160

Page 1: ...Operating manual W RTSIL JOVYCUBE 160 BAX 5157_en...

Page 2: ...2 BAX 5157 W RTSIL JOVYCUBE 160 Index Date Name Revision 0 09 03 2016 J Schulte First edition 1 2 3 4 5 6 7 8 9 10...

Page 3: ...al connections cross sections fuses 13 3 2 1 Fuses and cross sections for cable connections to the UPS 14 3 2 2 Connections to the UPS 14 3 2 3 Mounting and connecting the battery 14 4 Operation 15 4...

Page 4: ...1 1 Removal 33 6 1 2 Erase missing module from the controller 33 6 1 3 Installation 33 6 1 4 Replacing a fan resetting the interval 33 6 2 Maintenance 34 6 2 1 Visual inspection 34 6 2 2 Function test...

Page 5: ...manual reflects the technical status of the UPS at the time of printing Its contents are not part of any contract but are for information purposes only W rtsil JOVYATLAS EUROATLAS GmbH reserves the r...

Page 6: ...scribed work and they must use the proper intact tools equipment test equipment and materials Important instructions are indicated by the terms CAUTION ATTENTION and NOTE and by indented text passages...

Page 7: ...lure In comparison with conventional power sources such as the mains power supply or generators the cutting edge technology featured in UPS systems in the JOVYCUBE series brings the following outstand...

Page 8: ...ply ICB Input Circuit Breaker MBCB Manual Bypass Circuit Breaker BCB Battery Circuit Breaker OCB Output Circuit Breaker Output Output for the connection of consumers 2 1 1 UPS module One UPS module on...

Page 9: ...ed in parallel to the 20 kVA UPS modules The module s dimensions correspond to those of a UPS module The SBP can therefore be retrofitted into an existing system without difficulties provided there is...

Page 10: ...The inverters supply the load at the output with the necessary energy 2 3 Online operation load supplied via the inverter 2 2 2 Module error The mains feeds the rectifiers The rectifiers provide the...

Page 11: ...ly and the load is no longer supplied with power Note In case of failure of one phase at the input the load is proportionately supplied of the two remaining phases and from the battery until it is dis...

Page 12: ...ad via the UPS modules inverters 2 7 Bypass Mode Load supplied via the smart bypass Online mode VFI The mains feeds the rectifiers The rectifiers provide the DC voltage for the inverter and charge the...

Page 13: ...wing recommendations are only an indication as the UPS manufacturer is not responsible for the electrical installation In all cases we recommend installing and connecting the input and output in confo...

Page 14: ...r dimensioning to VDE 0100 Part 540 400V alternating voltage 160 kVA W RTSIL JOVYCUBE Cross section mm phases N PE Recommended fusing A Rectifier input 4 x 95 1 x 50 3 x 250 UPS output 4 x 95 1 x 50 B...

Page 15: ...equired The IP address is set in the factory to 192 168 0 2 and can be changed in its sole discretion The password for the basic access is set from the factory to pass123 and can be changed at your di...

Page 16: ...the cabinet instead of a 20 kVA module Door installation The display is installed in the door Note that in this case the protection class is lower IP20 4 3 Controller T4S The T4S is the central contr...

Page 17: ...is no longer possible This has the consequence that a service technician from W RTSIL JOVYATLAS needs to update the software Expert mode is reserved exclusively for W RTSIL JOVYATLAS NOTE The values...

Page 18: ...Last Discharge The manually battery test and or boost can be start here The following points must be true to start the test boost Logged in as expert Test Boost is enabled and configured in the param...

Page 19: ...rectified A red LED indicates a major fault Clicking Events will then show you the current fault A module highlighted grey has been removed or is not detected by the bus system 4 5 3 1 1 Module infor...

Page 20: ...power kW Apparent power kVA Plus utilisation per phase see diagram 4 6 Toolbar The following sections outline and explain the toolbar subgroups The toolbar gives you access to any information and para...

Page 21: ...4 6 2 Connections This is where you can view the assignment of the digital inputs and relay contacts 4 6 3 Files 4 6 3 1 Transfer Event History Export read fault memory as a text file filename extens...

Page 22: ...7 W RTSIL JOVYCUBE 160 4 6 3 2 Update For upgrading T4S firmware Import allows you to upload the new firmware 4 6 3 3 Language Selection of menu language Three languages can be stored updated changed...

Page 23: ...USP location logout time Passwords Password change Network Parameterisation of Ethernet connection Temperature sensors Configuration of temperature compensation battery Alarms Enable Disable Alarms 4...

Page 24: ...otal number of modules Number of redundant modules Number of battery circuits AC In A Input voltage configuration DC Group DC group configuration AC Out Output voltage configuration Other Configuratio...

Page 25: ...the expert level Attention The activation of the battery test is only allowed by trained personnel Note The battery test is only one time per week possible 4 6 4 5 2 Boost floating Boost Boost mode E...

Page 26: ...y Boost mode start by voltage current and period and stop by current are Disabled To be able to activate the Boost you have to go to the expert level Attention The activation of the battery test is on...

Page 27: ...tatus of input voltage Green OK Orange Input voltage being checked Red Error 4 Status of output voltage Green OK Orange Output voltage being synchronised Red Error 5 Status of battery Green OK Orange...

Page 28: ...e VFI mode ECO mode currently not operational 6 Status indicator for static bypass Alarm Green OK Amber Communications fault Red Fault see fault memory Overload Red Module overload Shutdown as per tec...

Page 29: ...voltages have been checked and are OK LED 3 IN and 5 BAT lit green 6 Only LED 4 OUT is still flashing between orange and green This means that the inverter is already running but the output has not y...

Page 30: ...he MBCB is closed No Action UPS status 1 Close ICB The operational modules switch 2 begin the start up procedure 2 The modules begin the start up procedure The four LEDs flash orange 3 Communication h...

Page 31: ...dules are shut down All LEDs go out 6 The display optional goes blank the UPS has been disconnected 5 8 Start up of an additional 20kVA CUBE module If the system has free slots for 20kVA CUBE modules...

Page 32: ...Remove the module quickly so as to avoid damaging the contacts 5 Delete the SBP module in the menu See chapter Deleting a missing module from the program 6 Slot in the new SBP module Slot the module i...

Page 33: ...e old module in the controlling of the system 6 1 2 Erase missing module from the controller NOTE Erasing of modules can only be done by trained people and only in expert mode of the T4S 1 Go to modul...

Page 34: ...ages Correct start up of all modules Check output and battery voltages 6 2 3 Battery inspection If the UPS is out of operation for a prolonged period maintenance free batteries must be recharged at th...

Page 35: ...r device number 6 3 1 Spare parts list optional Spare parts list W RTSIL JOVYCUBE 160kVA Code Description Number installed Type Value 35 5460 20 kVA UPS module 1 8 3 3 35 5469 PCB 138_004X BUS BOARD 8...

Page 36: ...properly inserted Check bus A connection Check bus A present connection Replace module Bus B failure Failure on bus B communication on bus B fail Contact W rtsila JOVYATLAS EUROATLAS GmbH crew Bus B n...

Page 37: ...e the module Hardware problem Replace inverter Driver Out Fault Failure inside the module Hardware problem Replace inverter Driver Out Fault Failure inside the module Replace the module Driver Out Not...

Page 38: ...the cabinet Replace defective module Out fuse Open Output fuse of the module is open The output current of the module is zero while other modules in detects some load Reset the module and try again If...

Page 39: ...connect Battery or check live value switch off front switch is in off position Switch on the switch at the front of the module Sync Bus A failure Failure in the synchronization of bus A communication...

Page 40: ...s is an abnormal conditions which occurs when the module has a failure Reset the module and try again If the problems still happens replace the module VoutMPi2Err Error in the self test during the sta...

Page 41: ...set point Battery discharge Check battery NO CHARGER No battery charger configured on the battery The battery cannot be kept charged Missing module Wrong configuration Check configuration Make charger...

Page 42: ...ltage tolerance 198 264VAC 100 load no power reduction 150 264VAC 70 load 30 power reduction 3x343 198VAC N to 3x457VAC N for 100 load 3x260 150VAC N to 3x457VAC N for 70 load Frequency 47 63Hz Power...

Page 43: ...stable Ambient temperature 0 25 C 8 6 Touchscreen Rack mounting Type 7 LCD resistive touchscreen Resolution 800 x 480 pixels Input voltage 1 x 12VDC supplied from T4S Terminals 1 x USB 1 x Ethernet 3...

Page 44: ...Relative humidity Max 95 non condensing Standards Safety EN62040 1 1 EN60950 1 EMC EN62040 2 EN61000 3 3 EN61000 6 2 EN61000 6 4 Power class EN62040 3 9 Appendix Description Drawing no page Cover she...

Page 45: ...Checked Ursprung Origin Name Name Datum Date 09 03 2016 A B C U86 109 00_DB Allgemeintoleranzen General tolerances DIN ISO 2768 m F26_JOVY_A3_DE_EN Beschreibung Description Auftrags Nr Order no Zeichn...

Page 46: ...3x380 220VAC N nominal 3x400 230VAC N nominal 3x415 240VAC N 50 60Hz max 60kVA kW X3 Einspeisung Input Externe Batterie external battery X1 Einspeisung Input 3x343 198VAC N to 3x457VAC N f r 100 load...

Page 47: ...CTION DEGREE WEIGHT MODULES INCL RITTAL BASED ON TS 8 RAL 7035 IP 20 approx 380Kg ON OFF 1 2 3 IN OUT BATT COM ON OFF 1 2 3 IN OUT BATT COM ON OFF 1 2 3 IN OUT BATT COM ON OFF 1 2 3 IN OUT BATT COM ON...

Page 48: ...AC N to 3 457VAC N f r 100 load 3 260 150VAC N to 3 457VAC N f r 70 load Ausgang Output 3 380 220V 3 400 230V 3 415 240V 50 60Hz von of Kunde Client Name Name Gepr ft Checked Ursprung Origin Name Name...

Page 49: ...t nominal 3x380 220VAC N nominal 3x400 230VAC N nominal 3x415 240VAC N 50 60Hz max 160kVA kW X3 Einspeisung Input Externe Batterie external battery X8 Programmier Schnittstelle Programming interface S...

Page 50: ...lient Name Name Gepr ft Checked Ursprung Origin Name Name Datum Date 09 03 2016 A B C U86 109 00_SP Allgemeintoleranzen General tolerances DIN ISO 2768 m 250 A 250 A 1 2 232 A X0 ERDUNGSSCHIENE EARTHI...

Page 51: ...ired ON OFF 1 10 A2 UPS Modul 20KVA Batt B N CN1 B ACin L1 L2 L3 AC_out L1 L2 L3 PE ON OFF 1 10 A3 UPS Modul 20KVA Batt B N CN1 B ACin L1 L2 L3 AC_out L1 L2 L3 PE 1 10 1 10 1 8 A1 1 PCB138_004 X2 X1 U...

Page 52: ...uit proofed wired Die Anzahl der Module variiert von 1 8 The number of modules vary from 1 8 ON OFF 1 10 A5 UPS Modul 20KVA Batt B N CN1 B ACin L1 L2 L3 AC_out L1 L2 L3 PE ON OFF 1 10 A6 UPS Modul 20K...

Page 53: ...discharge 16 18 System ausgelastet System saturated 19 21 Redundanz verloren Redundancy lost 22 24 Modul Fehler Module failure 01 03 Hauptalarm Major alarm 04 06 Voralarm Minor alarm 07 09 AC Input Fe...

Page 54: ...toring Ub Ub 2 Ub 01 02 03 A56 P0037401 Battery symmetry monitoring Ub Ub 2 Ub 01 02 03 Symmetrie berwachung Symmetry monitoring 1 2 Symmetrie berwachung Strang 1 Symmetry monitoring String 1 A57 P003...

Reviews: