INSTALLMENT
The machine is equipment with power voltage compensation equipment. When power
voltage moves between± 15% of rated voltage, it still can work normally.
When use long cable, in order to prevent voltage form going down, bigger section cable is
suggested. If cable is too long, it may affect the performance of the power system. So we
suggest you to use
configured length
1. Make sure that the air intake of the machine is not blocked or covered.
2.
Make good connection of shielded gas source. Gas supply passage includes cylinder, argon
Regulator
flow meter and pipe.
3. Use inducting cable whose section is not less than 6 mm
2
to connect the housing to the
ground. The way is from the ground-connecting screw at the back to the earth device.
4. Correctly connect the arc torch or holder according to the sketch. When use MMA welding; Make sure
the cable, holder and fastening plug have been connected with the ground. Put the fastening plug into
the fastening socket at the "-"polarity and fasten it clockwise.
5. Put the fastening plug of the cable to fastening socket
of "+" polarity at the front panel, fasten it clockwise, and
the earth clamp at the other terminal clamps the work
piece.
6. According to input voltage grade, connect power
cable with power supply
box
of relevant voltage
grade. Make sure voltage is within permissible range.
After the above job, installment is finished and
welding is Machine is ready for Welding.
warning
Before connecting operation please make sure all the power is turned off. The right order is to
connect the welding cable and ground cable to the machine first, and make sure they are
firmly connected and then turn on the Machine.
6
Summary of Contents for INTIG 250
Page 6: ...IN TIG 250 ...