Installation step 3
Lay out heating wire and secure with fixing tape.
Once the floor has been marked up, the heating wire
can be laid out.
Gently pull the power supply cable from the box.
Do not remove the spool from the box as this will
cause the heating wire to twist.
After 3 metres of cable have been removed, you will
reach the point at which the power supply cable joins
the heating wire.
The joint should be taped to the floor at the start point.
The wire should be laid in parallel lines back and forth
across the main body of the area to be heated.
Using the wire spacing markings as tape down points,
secure the heating wire to the floor with strips of
adhesive tape supplied.
The strips should be about 25mm (1 inch) long.
In order to achieve even coverage of the balance of the
area to be heated, you may at this stage need to adjust
some of the wire spacing that you previously secured.
You may wish to alter the wire layout to fit your
particular room.
Where there are irregularities of room shape you can
manually lay out the heating wire, e.g. to provide warmth
around the basins, toilets, etc.