![Warmington TFG 800 Installation And Operating Instructions Manual Download Page 12](http://html1.mh-extra.com/html/warmington/tfg-800/tfg-800_installation-and-operating-instructions-manual_3450019012.webp)
5 September 2019
All dimensions are in mm
Copyright
12
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
2.3 AAC HEAT CELL ASSEMBLY
*Note: If plastering the Heat Cell structure, it is recommended to use a fibreglass mesh with a latex plaster to minimise
the chance of the plaster cracking. (See your plasterer for correct materials and applications).
The heat cell is constructed around the firebox, using 75mm Hebel aerated autoclaved concrete (AAC) panels.
(2400x600x75) Power Panels are required for basic heat cell construction as shown in detail “Firebox with Hebel Surround”.
*Visit
www.warmington.co.nz
site for AAC instructions (PDF download).
2.3.2 TFG 1000 HEAT CELL ASSEMBLED
2.3.1 TFG 800 HEAT CELL ASSEMBLED
Note : Two 100 x 100mm holes in the bottom back Hebel panels provide venting for Caitec air system.
2.3.3 TFG 1200 HEAT CELL ASSEMBLED
Note: Heat cell assembly details
When purchasing the AAC heat cell kit, the assembly guide will come
with the kit.
Note:
If solid plastering the heat cell structure, it is recommended to
use a fibreglass mesh with a latex plaster to minimise the
chance of the plaster cracking. (see your plasterer for correct
materials and applications).
1
1
1