background image

15 September 2017

 

 

All Dimension are in mm………….Copyright © 

 

4

 

Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.

 

PLAN VIEW OF CLEARANCES TO COMBUSTIBLES 

—CORNER & SRAIGHT “Tested to ASNZS : 2918”

 

BAFFLES &  POSITIONING

 

Situation

 

 

1

.

 

Combustible Surface with stainless steel 
reflective Flue Shield*

 

2.

 

Non

-

combustible surface including 

walls, finishings and framing without 
Flue Shield, e.g. Concrete/Block/Brick/
ACC

 

Re Clearance to a Non Combustible 
materials walls

 

or surfaces Ref to 

ASNZS:2918:2001 3.2.1.

 

The clearance to a Non Combustible 
wall or surface can be less that 
100mm if a wet back is not fitted and 
no requirement for maintenance.

 

 

 

* Construction of Flue Shield must be in 
accordance with ASNZS 2918 (minimum 
Flue Shield height is 1200mm)

 

Baffle in Position

 

Steel Baffle

 

Vermiculite 
Board

 

Description

 

 

 

46L :1

 

46L :2

 

70L :1 

 

70L :2

 

 

To Wall Behind

 

I

 

150

 

100

 

 

 

To Wall Side

 

J

 

350

 

100

 

 

 

To Flue Centre

 

K

 

320

 

270

 

 

 

Hearth Depth

 

L

 

1000

 

950

 

 

 

Hearth Width

 

M

 

840

 

840

 

 

 

Hearth Projection*

 

N

 

300

 

300

 

 

 

To Flue Centre

 

O

 

503

 

453

 

 

 

Hearth Depth

 

P

 

1386

 

1321

 

 

 

To Wall Side

 

Q

 

150

 

100

 

 

 

Hearth Projection**

 

R

 

680

 

680

 

 

 

To Flue Centre

 

S

 

712

 

641

 

 

 

* Measurement taken from front feet

 

** Measurement taken from flue centre

 

Summary of Contents for Tasman 46L Fire

Page 1: ...ation details for the Warmington Fire Installation The Warmington unit is to be Installed by a Certified Warmington Installer or a Certified NZHHA SFAIT Installation Technician See www warmington co n...

Page 2: ...CIENCY BURNING SOFTWOOD 66 Council Authorisation No Ecan 111359 Nelson 111359 When Tested in Accordance with AS NZS 4012 Performance may vary from tested values depending on actual operating condition...

Page 3: ...d for most types of freestanding wood burners Check List Front Steel Baffle Vermiculite Board Baffle Brick Vermiculite Side Bricks X2 Check Door Seal Check Damper Control Serial Number Check Packed By...

Page 4: ...s walls or surfaces Ref to ASNZS 2918 2001 3 2 1 The clearance to a Non Combustible wall or surface can be less that 100mm if a wet back is not fitted and no requirement for maintenance Construction o...

Page 5: ...lite Board baffle brick in first on an angle through the door frame then repeat for the steel baffle Join the two parts together lift it up holding it horizontally resting on the one side bricks Fit b...

Page 6: ...pproximate Note Before using the Fire with a Wet Back Fitted Consult your plumber for wet back system configurations and oper ation Wet back is to be fitted to an internal heat sync before use e g Hot...

Page 7: ...be assembled with crimped ends down towards heater STAGE 7 Place Ceiling Plate over heater flue spigot ensuring the folded edge up stands are facing ceiling STAGE 8 From the roof lower Flue Pipes thr...

Page 8: ...pipe casing Note External Requirements Refer to AS NZS2918 2001 4 9 1 Install Flue system to AS NZS2918 2001 When using a rubber or Bitumen flashing Butynol Dectite an Additional Flue pipe Baffle is...

Page 9: ...oved outdoors immediately to a location clear of combustible materials 4 Cooking Because the top of the fire is in direct contact with the flame it offers a large cooking surface Ideal for entertainme...

Page 10: ...Fire Contact with your local TA Territorial Authority to check for local compliance 11 Flue System The installation and construction of the flue system must comply with ASNZS 2918 The fire requires a...

Page 11: ...mary on Setting High Temp Pain Read Stove Manufacturer instructions Babies small children pregnant women and pets should leave the area during the paint setting phase Ventilate well Paint surface will...

Page 12: ...8 2001 and the appropriate Building codes The Flue system and Fireplace is to be swept annually or more frequently if required The Appliance and Flue System has been tested to ASNZS2918 2001 WARNINGS...

Reviews: