background image

Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification. 

All Dimension are in mm………….Copyright ©  

18 May 2015 

The Warmington fire is designed with our exclusive 
‘Caitec’ technology.   
Air is drawn from an external source which is then    
circulated through the firebox sending warm air back 
into the room.  This maximises efficiency whilst 
maintaining the home at a constant pressure          
equilibrium, reducing the risk of back draft. 
 

To start and maintain a good fire, you need the following: 
 

 

Newspaper (not coloured or coated). 

 

Box of matches 

 

Packet of firelighters (optional) 

 

Quantity of  finely split, dry soft wood kindling (such as pine). 

 

Seasoned dry, split firewood in range of sizes. (do not burn: 
treated wood, painted wood, plywood, particleboard or MDF). 

 

LIGHTING THE FIRE

 

“CAITEC” UNIQUE TO WARMINGTON’S DESIGN

 

Generally fire wood is cut to 300 to 350mm 
lengths and split to 150 to 180mm cross sec-
tion. Note the Season Cracks in the ends. 

Kindling is finely split and ideal for starting the 
fire. 

Firelighters may be used 

Newspaper 

Matches. 

Summary of Contents for SI440

Page 1: ...mm Copyright 1 18 May 2015 Warmington SI Open Wood Fires Maintenance and Operating Instructions How to light and maintain an Open Wood Please Keep these instructions for future reference Manufactured...

Page 2: ...sure equilibrium reducing the risk of back draft To start and maintain a good fire you need the following Newspaper not coloured or coated Box of matches Packet of firelighters optional Quantity of fi...

Page 3: ...e fire When the fire is established put on larger pieces in a criss cross pattern You may notice a faint smell on the first light of the fire This is the paint coat curing and this smell will soon dis...

Page 4: ...ses you will be able to run a smaller and slower fire It is now time to put on the larger split timber logs Keep the area under the ash pan and at the rear of the ash pan clear of ash This space allow...

Page 5: ...logs be used during high fire operation This will vary depending on the size of the fire In the event of a soot or creosote fire Alert all the people in the house Have them leave or be ready to leave...

Page 6: ...t on the pressure difference from inside the building to the outside A lower pressure in the building may induce a draft down the flue system and back into the building causing the fire to smoke or sp...

Page 7: ...cessories Sparkguards etc 8 Damage incurred by over firing Not included in the Warranty for SI1250 SI1500 Larger Warmington Open Fires 1 Hebel Enclosure Replacement or Commercial fire Back have a 12 M...

Page 8: ...ctions to the threaded brass pipe of the wetback Inlet and outlet pipes are at different heights permitting flow of water in one direction and need to be correctly connected by the Plumber see our Wet...

Reviews: