![Warmington SG 700 Installation Insrtuctions Download Page 18](http://html2.mh-extra.com/html/warmington/sg-700/sg-700_installation-insrtuctions_3403023018.webp)
14 June 2016
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
All Dimension are in mm……..Copyright ©
18
DIAGRAM B ( SHOWING CONTROL VALVE WITH TEST POINTS AND ADJUSTING SCREW ).
After checking the pressure, turn the unit off, remove Manometer from the Test Point and Tighten the Test Point
Screw. Ensure to check for gas leaks.
Ensure Power is Off & Reconnect Modulator Harness Connection in the Main Harness. See Diagram B Above .
Turn the Appliance On and Off a few times to check ignition.
When you are satisfied that the Appliance is working correctly , fit the Front Panel Assembly back to the Gas
Burner.
NOTE : Ensure you peel the Protective Plastic Coating from any Stainless Steel components if fitted.
All Burner Aerations are Factory Preset and cannot be adjusted.
If you are unable to get the unit to operate correctly, refer to troubleshooting before contacting your Local Ser-
vice Contact as listed.
It may take approximately 2 hours of operation for the coals/Logs or river rocks to achieve their full flame pattern
and glow.
During the Initial Burning in period, some smoke and smell may be experienced , the appliance should be run on
the high position in a well ventilated room until these dissipate .
DIAGRAM B
Modulator Harness
Connections
Modulator Harness Connections
Nut A
Screw B