
COMMISSIONING
This appliance must be commissioned. Failure to commission the boiler will invalidate the
warranty. After commissioning, ensure that the Boiler Passport is completed and returned.
SERVICING
To ensure continued reliable operation, fuel economy and to validate the guarantee, it is
recommended that the boiler is serviced annually by a Warmflow or an OFTEC registered
technician.
NI Customers Only
Warmflow Engineering Service division (NI) provides an excellent back-up service, operating a
team of OFTEC trained engineers who can meet all the servicing, commissioning and
breakdown requirements for your appliance.
Tel:
028 9262 1515
Fax:
028 9262 2827
E-mail:
Web:
www.warmflow.co.uk
For Parts, Service Technical & Warranty Contact
Great Britain & N. Ireland, Tel: 028 9262 1515
Republic of Ireland, Tel: 048 9262 1515
HEAD OFFICE
GB OFFICE
Lissue Industrial Estate, Moira Road,
Warmflow House, Unit C4
Lisburn, Co. Antrim, N. Ireland, BT28 2RF
Stafford Park 4, Telford, TF3 3BA
Tel:
(028) 9262 1515
Tel:
(01952) 607 750
Fax:
(028) 9262 0869
Fax:
(01952) 603 983
E-mail:
E-mail:
2
2500 Overs
WAR139220 Agentis Boiler Manual
Sig
2 Front
Summary of Contents for Agentis B Series
Page 2: ......
Page 30: ...Page 29 4 5 Components 4 5 1 B Series Boilerhouse Casing Key Components...
Page 31: ...Page 30 4 5 2 I Series Internal Casing 21 26 33 Models 44 Models...
Page 32: ...Page 31 4 5 3 I Series Internal Key Components 21 26 33 Models 44 Models...
Page 33: ...Page 32 4 5 4 I Series Internal Pump Group 21 26 33 Models 44 Models...
Page 35: ...Page 34 4 5 7 E Series External Casing 21 26 33 Models 44 Models...
Page 36: ...Page 35 4 5 8 E Series External Key Components 21 26 33 Models 44 Models...
Page 37: ...Page 36 4 5 9 E Series External Pump Group 21 26 33 Models 44 Models...
Page 39: ...Page 38 4 5 12 Combination Boiler Pipe Layout...
Page 41: ...Page 40 5 1 2 I Series Internal I21 I26 I33 5 1 3 I Series Internal I44...
Page 43: ...Page 42 5 1 6 E Series External Base Tray E21 E26 E33 5 1 7 E Series External E44...
Page 45: ...Page 44 5 1 10 E Series External Combination Boiler Base Tray E21C E26C E33C...
Page 61: ...Page 60 6 3 3 External 230V Two Channel Programmer Room Thermostat Optional Outdoor sensor...
Page 62: ...Page 61 6 3 4 Internal Two Channel Programmer and Room Thermostat Optional Outdoor Sensor...
Page 73: ...Page 72 6 6 9 Honeywell Y Plan Independent CH DHW Fully Pumped Only 2 CHANNEL TIMECLOCK...
Page 74: ...Page 73 6 6 10 Honeywell S Plan Independent CH DHW Fully Pumped Only 2 CHANNEL TIMECLOCK...
Page 93: ...Page 92 Kabin Pak External Plume Management Kit KPMK The kit comprises...
Page 107: ...Page 106 11 4 Burner Start Up Cycle Lock out is indicated by a lamp on the control box...
Page 122: ...Page 121 14 SPARES 14 1 RDB 2 2 BX Spares...
Page 124: ...Page 123 14 2 RDB 3 2 BX Spares...
Page 134: ...Page 133 Intentionally left blank...
Page 135: ......