
Page
23
2 CONDENSING BOILER INSTALLATION REQUIREMENTS
The Warmflow condensing boiler can be fitted to most installations using standard
practices and techniques. There are however a number of considerations that
must be taken into account.
1.
All existing systems must be properly flushed to remove any sediment/
sludge in order to prevent any blockage or reduction in efficiency of the
boiler.
2.
The system must be fully pumped.
3.
The primary difference between an ordinary boiler and a condensing boiler
is the condensate drain. The drain can be plumbed from the condensate
trap in any ordinary plastic pipe, e.g. plastic overflow pipe, directly into the
household drain or soak away.
Any blockage in the drain could lead to an alteration in the combustion
settings because of partially blocked flueways.
Where the boiler is fitted into a basement, a condensate pump may be
required.
4.
As an indicator of the increased efficiency of a condensing boiler there may
be a visible plume of ‘steam’ from the flue. Care needs to be exercised when
positioning the appliance and selecting the type of flue to ensure that the
plume does not cause a nuisance to the householder or to surrounding
properties.
As the water temperature in the system rises the pluming effect will diminish.
Even where pluming is not visible the boiler is still operating more efficiently
than a standard boiler.
Summary of Contents for Agentis B Series
Page 2: ......
Page 30: ...Page 29 4 5 Components 4 5 1 B Series Boilerhouse Casing Key Components...
Page 31: ...Page 30 4 5 2 I Series Internal Casing 21 26 33 Models 44 Models...
Page 32: ...Page 31 4 5 3 I Series Internal Key Components 21 26 33 Models 44 Models...
Page 33: ...Page 32 4 5 4 I Series Internal Pump Group 21 26 33 Models 44 Models...
Page 35: ...Page 34 4 5 7 E Series External Casing 21 26 33 Models 44 Models...
Page 36: ...Page 35 4 5 8 E Series External Key Components 21 26 33 Models 44 Models...
Page 37: ...Page 36 4 5 9 E Series External Pump Group 21 26 33 Models 44 Models...
Page 39: ...Page 38 4 5 12 Combination Boiler Pipe Layout...
Page 41: ...Page 40 5 1 2 I Series Internal I21 I26 I33 5 1 3 I Series Internal I44...
Page 43: ...Page 42 5 1 6 E Series External Base Tray E21 E26 E33 5 1 7 E Series External E44...
Page 45: ...Page 44 5 1 10 E Series External Combination Boiler Base Tray E21C E26C E33C...
Page 61: ...Page 60 6 3 3 External 230V Two Channel Programmer Room Thermostat Optional Outdoor sensor...
Page 62: ...Page 61 6 3 4 Internal Two Channel Programmer and Room Thermostat Optional Outdoor Sensor...
Page 73: ...Page 72 6 6 9 Honeywell Y Plan Independent CH DHW Fully Pumped Only 2 CHANNEL TIMECLOCK...
Page 74: ...Page 73 6 6 10 Honeywell S Plan Independent CH DHW Fully Pumped Only 2 CHANNEL TIMECLOCK...
Page 93: ...Page 92 Kabin Pak External Plume Management Kit KPMK The kit comprises...
Page 107: ...Page 106 11 4 Burner Start Up Cycle Lock out is indicated by a lamp on the control box...
Page 122: ...Page 121 14 SPARES 14 1 RDB 2 2 BX Spares...
Page 124: ...Page 123 14 2 RDB 3 2 BX Spares...
Page 134: ...Page 133 Intentionally left blank...
Page 135: ......