![Wardrobes Online Maxi Wall Hung Series Installation Instructions Manual Download Page 4](http://html1.mh-extra.com/html/wardrobes-online/maxi-wall-hung-series/maxi-wall-hung-series_installation-instructions-manual_3366848004.webp)
12.
Once all panels and shelves/drawers are secured, measure along the top of the system from wall-to-wall to get
your overall width measurement for the top shelf. Cut the top shelf to size using an 8pt saw. We recommend
using masking tape along your cut line before you cut, to reveal a nice clean cut. Screw the top shelf into each
vertical gable at the front and back. If you have limited space above the top shelf and cannot access with a screw
driver, we recommend securing the top shelf from underneath using Econo brackets (supplied).
13.
Screw hanging rail brackets to their opposing walls. Top rail should be installed as shown: 50mm down from the
top and 300mm from the back wall is where the top of the bracket should be fixed.
For mid height rails, we recommend installing them 1m below the top height rail. Slot hanging rails into
brackets. Refer to Hanging Rail instructions for information about cutting rails to size.
14.
Once everything is in place including the top shelf, secure the system to your gibbed walls with the Econo
brackets supplied. Where possible, fix Econo bracket into studs. Use a 5mm drill bit. If your system has drawers it
is recommended to secure Econo brackets under the shelf above the top drawer, this will be hidden at the very
back and will help your system stay square for efficient drawer operation.
300
Summary of Contents for Maxi Wall Hung Series
Page 5: ...Diagram A...