background image

 

Operating Instructions 

 

 

Castors  

 

The trolley is fitted with four 150mm diameter, individually braked castors. 

To engage the brakes, place your foot on the front part of the brake lever (Fig 1) and push down 

firmly, the brake will lock in place and stop the castor from moving. 

To release the brake place your foot on the rear part of the brake lever (Fig 2) and press down 

firmly, this will release the brake. 

 

If your trolley is fitted with a Directional Locking Castor, this is denoted by the green locking lever.  

To engage a directional locking castor: 

 

Stand at the head end of the trolley, push the trolley forward by approximately 1 metre.  

This will ensure that the directional locking castor is the ‘trailing’ position under the trolley 

(Fig 3).   

 

Engage the directional lock by pushing down firmly on the green lever (Fig 4).                          

   

To release the directional lock place your foot on the green lever, on the rear/raised part, 

and press firmly to release (Fig 5). 

 

Fig 1 

Fig 2 

Press down  

firmly to release 

Press down  

firmly to lock 

Fig 3 

Push forward from  

head end 

Locked for Directional use 

Fig 4 

Fig 5 

Unlocked 

Summary of Contents for GT5501

Page 1: ...GEN S 19 264 NOVEMBER 2019 GT5501 General Transport Adjustable Height Patient Trolley OPERATORS MANUAL...

Page 2: ...eantime or would like any advice about this or any other products from the Wardray Premise range please contact us at the following address Wardray Premise Limited Hampton Court Estate Summer Road Tha...

Page 3: ...ge is available and details are available upon request from our Service Department on 44 0 20 8398 9911 For international customers please contact your local Wardray Premise representative for assista...

Page 4: ...ptional Directional Locking Castor see page 8 Backrest gas cylinder Serial Number under backrest Brake Lever Plunger IV Pole stored on left of head Push bar Thumb screw for IV Pole Pull Handle for Tre...

Page 5: ...raise until it stops repeat until desired height is reached or top height is achieved Fig 2 To lower place foot on black rubber and push down until you feel the stop then push further and table top w...

Page 6: ...the horizontal position the upward movement is power assisted Backrest The backrest is operated by squeezing the handle located under the right hand side of the backrest board at the head end as shown...

Page 7: ...ops To raise the cot sides hold the top rail in the centre and lift until the plunger engages To operate Flag Plunger To lower the cot sides disengage the black flag plunger by pulling and turning upw...

Page 8: ...ocking Castor this is denoted by the green locking lever To engage a directional locking castor 1 Stand at the head end of the trolley push the trolley forward by approximately 1 metre This will ensur...

Page 9: ...e of the base Fig 1 Fig 1 IV Pole The trolley is fitted with 4 locations for the IV pole 1 located at each corner of the trolley A thumb screw allows the pole both to be locked vertically for use and...

Page 10: ...olley over rough or uneven ground Drop heavy or sharp objects onto the solid plastic top Push the trolley by the cot sides these are for patient safety only Place a weight of over the equivalent of 34...

Page 11: ...r the trolley a couple of times before using check for any leaks especially if the trolley has not been used for a long period of time Check the cot sides for functionality and damage especially the c...

Page 12: ...per towels If required the product can be washed down with hand hot sodium hypochlorite solution up to 1 or 10000 parts per million chlorine combined with a detergent Alternatively follow your local g...

Page 13: ...13...

Page 14: ...14...

Reviews: