WWW.
WAMBAM
FENCE.COM
7
ASSEMBLY
INSTRUCTIONS
VF13002
STEP 2
:
INSTALL
POSTS
STEP 2.1
STEP 2.2
10
”
36”
84”
After stringing your fence line, dig
your first post hole 10” diameter x
36” deep. Dig your second hole 84”
center to center to your first hole.
Dig only three or four holes at a time
to ensure proper spacing.
Add approximately 18” of concrete to
the bottom of the hole. Then, install the
Posts
(B)
straight and level. Add more
concrete to within 2” of ground level.
79½”
B
STEP 3
:
INSTALL
RAILS
STEP 3.1
STEP 3.2
STEP 3.3
Slide the Bottom Rail
(E)
through the channel in the post
until it is about 2” above the
ground.
Use wooden blocks as
temporary spacers.
E
Insert the Pickets
(C)
into the
bottom rail as illustrated.
Slide the Top Rail
(D)
into
place over the pickets.
Note:
The pickets cannot be
removed once inserted into the
bottom rail.
C
D
2”