WWW.
WAMBAM
FENCE.COM
12
ASSEMBLY
INSTRUCTIONS
VF14101
STEP 2.4
STEP 3.1
STEP 2.5
At 6” intervals, check that the pipe anchor is
level.
Pounding the pipe anchor from all four
sides will help to achieve this.
Drive the pipe anchor 36”
into the ground. 24” of the
pipe anchor should be above
the ground.
Identify your string line with
stakes.
24”
STEP 3:
LAY OUT
STRING LINE