background image

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Please retain product label and instructions for future reference

             

17

Step 13

Place the door knob (No. 22) on the outside of the

door, screwing into the desired position.

  

Pre drill 

hole

Summary of Contents for 5x5 Corner Playhouse

Page 1: ...ain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be hel...

Page 2: ...PLAY0505 V1D Window QTY 2 AI 03FW540X1132 V1 Roof PI 03 Floor AI 02CORPLAY0505 V1F Panel Frame 28x28x1240mm FS2828 1240mm Eaves Frame 28x28x884mm QTY 2 FS2828 884mm Eaves Frame 28x28x1436mm QTY 2 FS28...

Page 3: ...from the fixing kit as a guide to achieve the correct spacing Once in position fix the door to the door panel with the 3x hinges No 19 securing each hinge using 7x30mm black screws 21x30mm black screw...

Page 4: ...ding to the floor until after the roof has been fitted 3x50mm Screws a b Pre drill hole 50mm screw 2 a b a a Step 5 Following the same method outlined in Step 4 fix the first window panel No 2 into po...

Page 5: ...h each end of the ridge bar Once in place position the ridge bar between the gable and window panel securing into position using 2x30mm screws per side 4x20mm Screws 4x30mm Screws Pre drill hole 20mm...

Page 6: ...re the felt to the roof using 78x felt tacks 78x Felt Tacks Step 12 Arrange the cover strips No 16 at front and side s of the building and fix into place using 3x30mm screws per strip At the front of...

Page 7: ...een assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Please retain product label and instructions for future reference 17 Step 13 Place the door knob...

Reviews: