Step 2

Place the floor (No. 4) onto a firm and

level base. Ensure the base has suitable 

drainage and is free from areas where

standing water can collect.

*See front page for base requirements.

Step 3

 

Place the plain gable (

No. 3

)

 

and the first plain side (

No. 4

)

 

onto the floor and fix at the

 

corner using 3x50mm screws.

 Do 

NOT

 secure the building to

 

the floor until the roof has been

 

fixed in place.

3x50mm Screws

50mm 

screw

Pre drill 

hole

P 3

Please retain product label and instructions for future reference

             

Step 5

Fix the 2x “L” brackets (

No. 18

) to 

either end of the ridge bar (

No. 7

using 2x20mm screws per bracket.

*Ensure the bracket plate(

s

) are 

flush with each end of the ridge 

bar.

Once in place position the ridge bar

between the gable and window

panel, securing into position using

2x30mm screws per side. 

4x20mm Screws

4x30mm Screws

Pre drill 

hole

20mm 

screw

30mm 

screw

7

18

2

3

a

b

a

b

b

b

b

b

a

b

a

a

a

a

a

a

a

a

a

b

b

b

b

b

b

Step 4

 

Following the same method

 

outlined in Step 3, place the 

 

assembled door gable and 

 

the second plain side (

No. 4

)

 

onto the floor and fix at the

 

corner using 3x50mm screws.

 Do 

NOT

 secure the building to

 

the floor until the roof has been

 

fixed in place.

9x50mm Screws

50mm 

screw

Pre drill 

hole