Step 2
Place the floor (No. 4) onto a firm and
level base. Ensure the base has suitable
drainage and is free from areas where
standing water can collect.
*See front page for base requirements.
Step 3
Place the plain gable (
No. 3
)
and the first plain side (
No. 4
)
onto the floor and fix at the
corner using 3x50mm screws.
Do
NOT
secure the building to
the floor until the roof has been
fixed in place.
3x50mm Screws
50mm
screw
Pre drill
hole
P 3
Please retain product label and instructions for future reference
Step 5
Fix the 2x “L” brackets (
No. 18
) to
either end of the ridge bar (
No. 7
)
using 2x20mm screws per bracket.
*Ensure the bracket plate(
s
) are
flush with each end of the ridge
bar.
Once in place position the ridge bar
between the gable and window
panel, securing into position using
2x30mm screws per side.
4x20mm Screws
4x30mm Screws
Pre drill
hole
20mm
screw
30mm
screw
7
18
2
3
a
b
a
b
b
b
b
b
a
b
a
a
a
a
a
a
a
a
a
b
b
b
b
b
b
Step 4
Following the same method
outlined in Step 3, place the
assembled door gable and
the second plain side (
No. 4
)
onto the floor and fix at the
corner using 3x50mm screws.
Do
NOT
secure the building to
the floor until the roof has been
fixed in place.
9x50mm Screws
50mm
screw
Pre drill
hole
a
b