background image

It is highly recommended that you should 

apply wood treatment immediately after 

the building has been assembled.

Step 13

Pre drill holes from the shed panel 

top (8) straight into the green house 

roof panel. Use 4x70mm screws.         

70mm 

screw

Reviews: