Operating instruction and technical description
EV tester type 1 and type 2 - 2.0
©
Walther-Werke Ferdinand Walther GmbH
Seite 12 von 12
6 Maintenance
The EV simulator does not require any considerable maintenance. If necessary the battery of the built-in
measuring device has to be exchanged.
6.1 Battery change
Loosen the two PVC screws and carefully open the measuring device by loosening the screws on the
backside. Exchange the used batteries (LR 44 or identical in construction). Close the device and fix it on the
front plate.
Attention
:
In any case, the EV tester has to be separated from the charging device prior to any maintenance work!
Maintenance work may only be carried out by trained specialised staff.
To avoid increased contact resistances, the contacts on the charging sockets of the EV tester and on the
plugs of the charging cable and the measuring line have to be checked.
7 General technical specifications
Length
approx. 360 mm
Width
approx. 310 mm
Height
approx. 200 mm
Weight
approx. 2,7 kg
Voltage supply
230V / 400V
50 Hz
Switchable leakage current (from L 1 to PE)
> 30 mA corresponding to
resistance 3,3 k
Ω
Charging sockets for connection with infrastructure
Type 1 (5-pole)
Type 2 (7-pole)
Measuring line, special version
Plug type 2
Coupler type 2
7-pole wired through
Schuko socket for load connection on L 1.
230 VAC, max. 6 A