![Walter 39-D 252 Manual Download Page 18](http://html1.mh-extra.com/html/walter/39-d-252/39-d-252_manual_871160018.webp)
18
15) FITTING THE CHUCK
1.
The machine comes supplied with an Arbor Shank (48H591) & 13mm Chuck (39D008).
2.
Insert 48H591 into Arbor Spindle (48H596), ensure a good and tight fit is achieved.
3.
Insert 39D008 into 48H591, ensure a good and tight fit is achieved.
4.
Replacing the chuck is the reverse sequence, by utilising 48H460 (Drift).
16) MAINTENANCE
In order to get the best life out of your Walter machine, always keep it in good working order.
A number of items must always be checked on Walter machines.
Before starting any job, always make sure the machine is in good working order and that there are no
damaged or loose parts. Any loose parts must be tightened.
Before proceeding with any maintenance work be certain that the power supply is disconnected.
Description
Every operation
1 week
1 Month
Visual check of
machine for damage
X
Operation of machine
X
Check brush wear
X
Check magnetic base
X
Check alignment of the
machine
X
Check grease
X
Check armature
X
Visually check the machine for damage.
The machine must be checked before operation for any signs of damage that will affect the operation of
the machine. Particular notice must be taken to the mains cable, if the machine appears to be damaged
it should not be used, failure to do so may cause injury or death.
Check operation of the machine.
The machines operation must be checked to ensure that all components are working correctly.
Summary of Contents for 39-D 252
Page 1: ...ICECUTTM 250 Auto Magnetic Drilling Unit 39 D 252 120V This Machine is CSA UL certified...
Page 21: ...21...
Page 22: ...22 ICECUTTM 250 Auto Perceuse base magn tique 39 D 252 120V Cette machine est certifi e CSA...
Page 50: ...50 7A OPERACI N DEL PANEL DE CONTROL...
Page 63: ...63...
Page 64: ...64...
Page 71: ...71...