Before installation check that the correct OptiSorp system is used and that the system is in accord-
ance with the type and steam output on the specification label. 
The OptiSorp is suitable for installation in air ducts or air-conditioning units. For this purpose the tem-
plates supplied are attached to the ventilation duct spaced according to the collectors. The duct plate 
is cut out round. The connection side of the pre-fitted system is inserted from inside through these 
holes. The connector pieces are then fitted on the pipes from outside and screwed to the duct wall. 
The collector pipes should be aligned horizontally and secured at the end on the duct wall. 
For large systems or in special cases, where this type of installation is not possible, the collector 
pipes can be fitted individually from outside. The nozzle tubes are then inserted in the collectors in 
the air duct and secured with the pipe clamps and O-rings. Suitable pliers are required for the instal-
lation. All parts are supplied loose for this case if required. 
The steam and condensate hoses should then be installed according to the instructions in the techni-
cal tem. It is advisable to drain the condensate separately and not return it to the humidifier owing 
to the increased volume. 

1.5 

Putting into operation

When connected to several basic units these should be operated in parallel. Otherwise condensate 
runs into the units switched off and fills these until overflow occurs. Problems can then arise when 
switching on again.

 

The following should be ensured when putting into operation: 

1.  that the system pressure don’t increase over 1500 Pa. The system pressure is componed of the 

airduct static pressure, the pressure drop over the OptiSorp system (typical 500 Pa) and the back 
pressure in the steam hose (typical 100 Pa/m) 

2.  that no water splashes from the steam distribution system and the condensate runs out of the 

system satisfactorily. Condensating formation may be caused by: 
•  Steam supply pipe not properly drained 
•  Metallic steam pipe inadequately insulated 
•  Overstressed steam generator feeds water through steam pipe 
•  System condensate drain is blocked 
•  Extreme back-pressure in condensate hose 
•  Incorrect installation of condensate hose 

1.4 

Installation

1.6 

Maintenance

•  Visual inspection
•  Further details according to the technical documentation of the humidifier 

Summary of Contents for Defensor OptiSorp

Page 1: ...Technical Documentation Steam distribution system 1115766 EN 0806 OptiSorp...

Page 2: ......

Page 3: ...1 6 Maintenance 5 2 Notes for the planning engineer 6 2 1 Layout 6 2 2 Dimension diagrams 6 2 3 Power selection diagram OptiSorp Systems 1 4 7 2 4 Type key 7 2 5 Determination of the humidification d...

Page 4: ...made from stain less steel and high grade plastic components It is designed for con nection to the Walter Meier steam humidi fiers The OptiSorp steam distribu tion system is installed directly in the...

Page 5: ...d then be installed according to the instructions in the techni cal tem It is advisable to drain the con densate separately and not return it to the humidifier owing to the in creased volume 1 5 Putti...

Page 6: ...can be made with the software programme or from the layout tables The system is determined by the number of steam connections of the steam humidifier This also determines the maximum steam output The...

Page 7: ...h 30 45 D2 mm 350 500 650 800 1000 1200 1500 H min mm 450 600 800 950 1150 1350 1650 System 2 mD max kg h 60 90 D2 mm 350 500 650 800 1000 1200 1500 1800 2000 H min mm 450 600 800 950 1150 1350 1650 1...

Page 8: ...r faxing Layout data required Installation 1 Installation 2 Installation 3 Installation 4 1 Clear height of air duct B without insulation mm 2 Clear width of air duct H without insulation mm 3 Wall th...

Page 9: ...r vertical ducts When mounting in a vertical duct the nozzle pipes must have a minimum declination of 20 and the end pieces of the collector pipes must be turned so that the vertical condensate connec...

Page 10: ...screws Pay attention that the condensate drains are below the steam hose connection 5 Starting with the lowest collector pipe fix the steam hose connections with the 4 screws at the duct wall 6 Align...

Page 11: ...e four screws Pay attention that the condensate drains are below the steam hose connection 5 Starting with the lowest collector pipe fix the steam hose connections with the 4 screws at the duct wall 6...

Page 12: ...Range duct height mm Art No Foothold Pos 1 No x Length mm Rail Pos 2 mm Bracket Pos 3 450 950 1117477 1 x 450 mm 500 4 950 1350 1117478 2 x 450 mm 500 4 1350 2300 1117479 2 x 450 mm 1400 4 2300 3200...

Page 13: ...13 Notes...

Page 14: ...Notes...

Page 15: ...Walter Meier Climate International Ltd 2007 Printed in Switzerland Technical modifications reserved...

Page 16: ...er Climate International Ltd Talstr 35 37 P O Box CH 8808 Pf ffikon Switzerland Phone 41 55 416 61 11 Fax 41 55 416 62 62 www waltermeier com international climate waltermeier com Solutions for Indoor...

Reviews: