Wallnöfer H.F. GmbH          20140604 Manual Quick Insulation  

Page 10/11 

 

 
24.) This long female screw contains a small setscrew which you close to fix the whole system.  

 

 
25.) Put the lever back on and close the female screw tightly with the two spanners 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for Zebru Series

Page 1: ...to Zebrú models from serial number 1115 Date 04 06 2014 Example of a finished Quick Insulation Included components 2 steel frames to hold the panels in place 8 insulating panels Small parts like screws Tools needed Spanner size 11 and 13 Phillips screwdriver Torx size 10 screwdriver Read the whole manual before starting the installation ...

Page 2: ...nt to be placed on top 1 Install the lower frame first it s the one shown on the picture above 2 Lay it around the bottom of the stove you can open the screws in the corners to detach the frame if it was delieverd completely assembled The teeth of the frame must face upwards 3 After placing the frame around the stove close the screws to fix the frame ...

Page 3: ... side of the stove there are 2 pins which hold the side cover of the fittings in place Remove those pins and then place the frame on top of the stove 5 The teeth must face upwards 6 On the right side of the stove where the two pins where located previously you can now fix the upper frame with 2 screws ...

Page 4: ...age 4 11 7 Remove the lever of the fume flap before proceeding Use the size 11 spanner to hold the long female screw in the middle in place Then open the outher female screw with the size 13 spanner 8 Now remove the long female screw by repeating the step ...

Page 5: ...small panel on the right side The panels sit tight on the frames which means you may need to use some force to hook them in 10 Around the lever of the fume flap there may be a slotted hole which needs to be closed with a small cover delivered together with the insulation system 11 Go on by hooking in the panel on the left side ...

Page 6: ...on Page 6 11 12 Install the two panels on the front next 13 The panel for the bottom part of the front is hoocked in between the left and the right panel 14 You may open the door of the lower combustion chamber to make it easier to install this panel ...

Page 7: ...el there is a stainless steel corner which is pushed completely to the stoves body before closing the 2 screws which hold it in place 16 Close the door to see if everything is installed properly 17 The top part of the front is mounted in the same way just hook it in and it s finished ...

Page 8: ... 18 On the right side you can now mount the long strait panel which holds the two pins for the side cover 19 As soon as the rear panel is mounted all 4 sides of the stove are covered by the insulation 20 The top cover consists of two parts place them on the stove ...

Page 9: ...H F GmbH 20140604 Manual Quick Insulation Page 9 11 21 Done 22 Put a flat washer on the axle of the fume flap 23 Afterwards cover the remaining opening with the rosette and mount the long female screw on the axle ...

Page 10: ...H 20140604 Manual Quick Insulation Page 10 11 24 This long female screw contains a small setscrew which you close to fix the whole system 25 Put the lever back on and close the female screw tightly with the two spanners ...

Page 11: ...on Page 11 11 Optional Rear panel for the side cover of the fittings WT0098 26 Should you have opted for the rear panel of the side cover you need to place it behind the side cover and fix it with a few screws to the rear panel of the quick insulation ...

Reviews: