Wallnöfer H.F. GmbH 20140604 Manual Quick Insulation
Page 6/11
12.) Install the two panels on the front next
13.) The panel for the bottom part of the front is hoocked in between the left and the right panel.
14.) You may open the door of the lower combustion chamber to make it easier to install this
panel.