background image

12

BXMT32G

Chipper / Shredder

Setup Instructions

Pre-delivery Inspection Checklist

Do the following pre-delivery inspections (PDI).

Rotor turns freely and the knife clearance is correct.
All cutting edges are sharp and in working condition.
Discharge chute and deflector move freely.
Shredder gate functions correctly.
All belts are aligned and the tension is correct.
All fasteners are torqued to the correct specifications.
All grease points are lubricated.
Engine clutch and rotor sheave align.
Engine starts and operates, and fluid levels are correct.
Battery is fully charged.
Tire pressure is correct (see the tire sidewall).
Tires are in working condition.
Purchased accessories are included, if applicable.
Operator's Manual is in the storage tube.

Safety Checks

All safety labels are applied and legible.
Operating and safety instructions were reviewed.
All guards and shields are installed, and the covers are 

closed.
A retainer is installed through each hitch point.
Safety curtain is in the chipper hopper.
Jack stand functions correctly.

Reviews: