8�2     BOLT TORQUE

CHECKING BOLT TORQUE

The tables shown below give correct torque values for various bolts and capscrews.  Tighten all bolts to the 

torques specified in chart unless otherwise noted.  Check tightness of bolts periodically, using bolt torque 

chart as a guide.  Replace hardware with the same strength bolt.

ENGLISH TORQUE SPECIFICATIONS

SAE 2

(N�m)  (lb-ft)

Bolt Torque*

Bolt

Diameter

"A"

SAE 5

(N�m)  (lb-ft)

SAE 8

(N�m)  (lb-ft)

1/4"

5/16"

3/8"

7/16"

1/2"

9/16"

5/8"

3/4"

7/8"

1"

8

13

27

41

61

95

128

225

230

345

6

10

20

30

45

60

95

165

170

225

12

25

45

72

110

155

215

390

570

850

9

19

33

53

80

115

160

290

420

630

17

36

63

100

155

220

305

540

880

1320

12

27

45

75

115

165

220

400

650

970

METRIC TORQUE SPECIFICATIONS

8�8

(N�m)     (lb-ft)

Bolt Torque*

Bolt

Diameter

"A"

10�9

(N�m)     (lb-ft)

M3

M4

M5

M6

M8

M10

M12

M14

M16

M20

M24

M30

M36

.5

3

6

10

25

50

90

140

225

435

750

1495

2600

.4

2.2

4

7

18

37

66

103

166

321

553

1103

1917

1.8

4.5

9

15

35

70

125

200

310

610

1050

2100

3675

1.3

3.3

7

11

26

52

92

148

229

450

774

1550

2710

Torque figures indicated above are valid for non-greased or non-oiled threads and heads unless otherwise 

specified.  Therefore, do not grease or oil bolts or capscrews unless otherwise specified in this manual.  

When using locking elements, increase torque values by 5%.
*   Torque value for bolts and capscrews are identified by their head markings.

Summary of Contents for BXMC34BEU

Page 1: ...om PRINTED IN CANADA REV 080217 PART NUMBER Z97120 Keep this manual with the machine at all times Do not attempt to start or operate the equipment without thoroughly reviewing this manual for safe and...

Page 2: ...ECKLIST 19 4 5 CONTROLS 20 4 5 1 ENGINE BXMC34 SERIES 20 4 5 2 SHREDDER FEED 21 4 5 3 FEED CHUTE GRAB HANDLES 21 4 5 4 DRIVE ENGAGE HANDLE 22 4 6 MACHINE SET UP 22 4 7 FIELD OPERATION 23 4 7 1 PREPARE...

Page 3: ...y to the original purchaser and is not transferable Warranty is void if repairs are attempted by anyone other than a Wallenstein Authorized Service Centre If a difficulty develops with the product con...

Page 4: ...ls _________________________________________ Dealer s Rep Signature __________ __________ __________ Delivery Date The product manuals have been received by me and I have been thoroughly instructed as...

Page 5: ...ur and generally rectangular with single or multiple symbols The label illustrates requirements for safe operation safety equipment housekeeping etc These labels are accompanied by detailed instructio...

Page 6: ...angled chipper hopper that delivers wood material up to 75mm 3 0 diameter into the 2 bladed rotor for chipping A powerful gas engine on the frame provides power to the rotor through V belt brake clutc...

Page 7: ...inently hazardous situation that if not avoided will result in death or serious injury This signal word is to be limited to the most extreme situations typically for machine components which for funct...

Page 8: ...ber YOU are the key to safety Good safety practices not only protect you but also the people around you Make these practices a working part of your safety program Be certain that EVERYONE using this e...

Page 9: ...ety precautions and of how it works Review the safety instructions with all users annually 6 This equipment is dangerous to children and persons unfamiliar with its operation The operator should be a...

Page 10: ...park plug cable turn fuel valve off block chock the wheels 5 Knowyourcontrolsandhowtostopthemachine quickly in an emergency Read this manual and the one provided with the engine 6 Train all new person...

Page 11: ...ted adjusted and in good operating condition 7 Ensure that all safety shielding and safety signs are properly installed and in good condition 2 7 MAINTENANCE SAFETY 1 Good maintenance is your responsi...

Page 12: ...n operation maintenance repairing unplugging or moving 8 Before servicing adjusting repairing or unplugging perform the safe condition procedure disengage the drive shut off the engine ensurecomponent...

Page 13: ...s flooded crank until engine starts 15 DO NOT strike flywheel with a hard object or metal tool as this may cause flywheel to shatter in operation Use proper tools to service engine 16 DO NOT operate e...

Page 14: ...Chipper Shredder until such information has been reviewed Annually review this information before the season start up Make these periodic reviews of SAFETY and OPERATION a standard practice for all of...

Page 15: ...ANATIONS 3 1 HOW TO INSTALL SAFETY SIGNS Be sure that the installation area is clean and dry Be sure temperature is above 50 F 10 C Determine exact position before you remove the backing paper Remove...

Page 16: ...ly apply to both models Good safety requires that you familiarize yourself with the various safety signs the type of warning and the area or particular function related to that area that requires your...

Page 17: ...openings when the engine is running Install and secure access covers before starting engine Do not move or transport chipper when the rotor is turning Do not exceed a safe travel speed when transporti...

Page 18: ...gas engine on the frame provides power to the rotor through a V belt drive system Abraking clutch on the engine stops the rotor when the drive is disengaged PRINCIPLE COMPONENTS Lower Rotor Housing C...

Page 19: ...er Shredder requires that each operator reads and understands the using procedures and all related safety precautions outlined in this section A preoperational checklist is provided for the operator I...

Page 20: ...rical system ON and the engine will run Turn the switch counterclockwise to stop the engine Fuel Shut Off Valve This valve controls the flow of fuel to the engine Slide the lever to the right to turn...

Page 21: ...arying the flap opening 1 Move the flapper handle down to open the gate and allow the material to drop into the shredding rotor 2 Release the flapper handle and the spring will return the gate into it...

Page 22: ...e The chipper shredder must be resting on the level and stable ground dur ing operation using the chipper while on uneven ground is dangerous and may result in injury or damage to the machine 4 5 4 DR...

Page 23: ...thesizeandshapeofthematerial crotchety branches and logs can move in unpredictable ways as they pass through the chipperandcouldcauseinjuries Largecurved pieces should be cut to smaller straighter sec...

Page 24: ...r chipping 4 7 3 STOPPING PROCEDURE 1 Stop feeding material into the hopper 2 Move the throttle to idle position to slow the engine RPM Allow 10 15 seconds for the rotor to slow down 3 Disengage the d...

Page 25: ...n stop and let the rotor get back up to speed then restart feeding Do not reach into the feed hopper further than the hopper opening to avoid contact the blades on the rotor Use a stick or branch to p...

Page 26: ...collector bag Z99006 The mulch bag holds 2 7 cu ft 28 litres and is a mildew resistantsyntheticmaterial Itisaporousmaterial allowing air from the rotor to pass through without restricting collection...

Page 27: ...eck that everyone is clear of machine before restarting engine 7 Start the engine engage the drive system and resume working 4 7 9 SEVERE PLUG 1 Follow the stopping procedure and wait for all moving p...

Page 28: ...ollow this procedure 1 Remove the tarpaulin if covered 2 Bringthecollectorbagtomachine BXMC34BEU model 3 Review and follow the pre operation checklist OPERATING SAFETY Store the unit in an area away f...

Page 29: ...il changes IMPORTANT Do Not over grease Good maintenance is your responsibility Poor maintenance is an invitation to trouble Follow good shop practices Keep service area clean and dry Be sure electric...

Page 30: ...r blade check daily test sharpness every 50 hrs Shredder blades check daily test sharpness every 50 hrs Remove the belt shield to gain access to the grease zerk On a regular basis check all nuts bolts...

Page 31: ...RECORD CHART See Lubrication and Maintenance sections for details of service Copy this page to continue record Refer to your engine instruction manual for specific maintenance instructions requiremen...

Page 32: ...ith your fore finger and measure its defection Drive belt should deflect no more than 1 4 to 3 8 6 mm to 10 mm 4 If the belt requires adjustment loosen do not remove the 4 x bolts that hold the engine...

Page 33: ...g unhook from the shield mount and brake clutch clutch keep unbolt from the shield mount 7 Remove the old belt from the rotor sheave first then the brake clutch 8 Replace with the new belt 9 Replace t...

Page 34: ...s the stationary blade Be sure to tighten the blade mounting bolts to their specified torque when re installing the blades to the rotor 1 Ensure the engine is off ignition switch is off and the fuel v...

Page 35: ...on switch is off and the fuel valve is closed 2 Remove the 2 bolts that hold the upper rotor housing andcarefullyopentherotorhousing 3 Manually rotate chipper rotor plate so that one set of shredder k...

Page 36: ...e with guard removed Ledger Blades Each machine is equipped with a ledger stationary blade that acts as a shear for the moving rotor blades The ledger blade is designed with 4 usable corners When the...

Page 37: ...screen in the bottom of the rotor frame The screen retains the wood material in the rotor chamber until it is small enough to exit through the holes and drop to the ground under the rotor The standar...

Page 38: ...edure and replace belt Ensure machine is off Low engine speed Check that choke is off and throttle is set to maximum Blades and or knives are dull Rotate sharpen or replace blade and or knives Ensure...

Page 39: ...ual for specific trouble shooting instructions requirements Obstructed discharge Clear debris from discharge chute BXMC34B or material screen BXMC34S Ensure machine is off Rotor plugged Inspect and cl...

Page 40: ...chine Type Tires Dimensions L X W X H 43 x 40 x 49 110cm x 102cm x 125cm 43 x 38 x 47 110cm x 97cm x 120cm Weight 270 LBS 122 5 kg 250 LBS 114 kg Screens Not Availalble 2 Options W 2 7 Cu Ft 28 Litres...

Page 41: ...19 33 53 80 115 160 290 420 630 17 36 63 100 155 220 305 540 880 1320 12 27 45 75 115 165 220 400 650 970 METRIC TORQUE SPECIFICATIONS 8 8 N m lb ft Bolt Torque Bolt Diameter A 10 9 N m lb ft M3 M4 M...

Page 42: ...y to go 1082A355 GARDEN TRACTOR HITCH 1012L269 1082A355 For models BXMC34SEU Conversion kit simple to install Makes a finer mulch than the standard screen 1074L240 3 4 ROUND SCREEN 19MM For models BXM...

Page 43: ...E 29 H HEARING LOSS 11 I INFORMATIVE LABELS 5 L LEDGER 30 LEDGER BLADES 36 M MAINTENANCE LABELS 5 MULCH COLLECTOR BAG 26 MULCHING SCREEN 37 N NOTICE 7 P PPE 8 11 15 22 23 25 PRODUCT LABELS 5 R ROTOR 2...

Reviews: