background image

Placement 

Place the energy meter according to the 
diagram in the following page.

1. 

E.

Wallbox Meter

F.

Communication

I.

Wallbox
Master

I.

Building 
Loads

J.

Charging Installation

G.

RCDs+MCBs

D.

Fuse Box

B.

Utility Meter

A.

Grid

C.

Main Switch

Summary of Contents for PULSAR

Page 1: ...Manual DYNAMIC POWER SHARING...

Page 2: ...charger following the instructions listed in the charger s Installation Guide Only energy meters delivered by Wallbox are compatible Installation must be performed by qualified personnel only accordin...

Page 3: ...nel only according to local regulations 1 Install the charger following the instructions listed in the charger s Installation Guide 2 Only energy meters delivered by Wallbox are compatible 3 Installat...

Page 4: ...t software version before installing the meter Ensure the charger is powered off before connecting the meter A Standard of Business myWallbox license is needed For more information refer to your charg...

Page 5: ...n Wallbox Academy 4 Make sure to update your charger with the latest software version before installing the meter 5 Ensure the charger is powered off before connecting the meter 6 A Standard of Busine...

Page 6: ...chargers All models except Pulsar and Quasar 1 5 Communication protocol between Primary charger and Power Meter Modbus RTU 3 Quantity of Energy Meters 1 2 Quantity of Secondary Chargers All chargers 1...

Page 7: ...except Pulsar 2 Quantity of Secondary Chargers 3 Quantity of Energy Meters 4 Communication protocol between chargers 5 Communication protocol between Primary charger and Power Meter 1 Quantity of Prim...

Page 8: ...rimary charger and Energy Meter 500m 9 Configurable maximum phase current Charging network MCB 6 Maximum Total length of charging network 250m 8 Terminating Chargers 2 10 Configurable installation max...

Page 9: ...6 Maximum Total length of charging network 7 Maximum lenght between Primary charger and Energy Mete 8 Terminating Chargers 9 Configurable maximum phase current 10 Configurable installation maximum cur...

Page 10: ...s Devices Commander Commander 2 Copper C Copper SB Torx T20 Copper SB D Torx T9 Pulsar Plus Commander 2 C Primary Meter Cable STP Class 5E 500m Max Length F Connecting Cable UTP CAT 5E 250m Max Length...

Page 11: ...erial och verktyg FR A Destornillador Philips B Alicates de corte C Torx T9 D Torx T20 E Pelacables F Cable recomendado STP clase 5E longitud m xima 500 m Mat riaux et outils CA A Tornav s Philips B A...

Page 12: ...ing Power off and carefully open all the connected chargers Perform the steps listed in the section Installation of charging network of this manual Follow the instructions for opening the charger in t...

Page 13: ...carefully open all the connected chargers 2 Perform the steps listed in the section Installation of charging network of this manual Follow the instructions for opening the charger in the charger s ins...

Page 14: ...fully open only the primary charger Follow the instructions for opening the charger in the charger s installation guide Perform the steps listed in the Cabling network section of this manual For more...

Page 15: ...chargers Follow the instructions for opening the charger in the charger s installation guide 2 Perform the steps listed in the section Installation of charging network of this manual 3 For more detai...

Page 16: ...he chargers in a chain one charger is connected to the next one Chargers at the beginning and end of the chain must be configured as Terminating T chargers Chargers between the terminating chargers mu...

Page 17: ...a chain one charger is connected to the next one 2 Chargers at the beginning and end of the chain must be configured as Terminating T chargers 3 Chargers between the terminating chargers must be conf...

Page 18: ...the position of a switch on the control board Only for Pulsar and Commander A specific Part Number must be specified when ordering the unit NT option is Indicated with a P in the Part Number WBXX X X...

Page 19: ...a switch on the control board 2 Pre defined Factory Setting 3 Only for Pulsar and Commander A specific Part Number must be specified when ordering the unit Indicated with a P in the Part Number WBXX...

Page 20: ...nergy meter 1 Install the Primary charger according to the Installation Guide and connect it to the energy meter 2 Connect the secondary chargers as described in the Installation section of this manua...

Page 21: ...ircuits Follow the manufacturer s instructions to install the energy meter 2 Install the Primary charger according to the Installation Guide and connect it to the energy meter 3 Connect the secondary...

Page 22: ...the energy meter according to the diagram in the following page 1 E Wallbox Meter F Communication I Wallbox Master I Building Loads J Charging Installation G RCDs MCBs D Fuse Box B Utility Meter A Gri...

Page 23: ...ity Meter C Main Switch D Fuse Box A Grid B Utility Meter C Main Switch D Fuse Box A Grid B Utility Meter C Main Switch D Fuse Box A Grid B Utility Meter C Main Switch D Fuse Box A Grid B Utility Mete...

Page 24: ...GND Connection with Energy Meter Carlo Gavazzi EM340 EM112 EM330 D D RS485 NT T Commander 2 12V GND D D Temco SPM1 100 AC...

Page 25: ...Commander Connection with Energy Meter Carlo Gavazzi EM340 EM112 EM330 Temco SPM1 100 AC D D GND GND D D 12 V...

Page 26: ...Connection with Energy Meter Copper SB Rev A GND D D Temco SPM1 100 AC GND 12V D D Carlo Gavazzi EM340 EM112 EM330...

Page 27: ...Connection with Energy Meter D D Carlo Gavazzi EM340 EM112 EM330 GND RS485 T NT Copper SB Rev B 12V GND D D Temco SPM1 100 AC...

Page 28: ...1 2 3 4 5 6 7 8 9 0 RS485 T NT 12V GND D D Temco SPM1 100 AC Pulsar Plus GND D D Carlo Gavazzi EM340 EM112 EM330 Connection with Energy Meter...

Page 29: ...Copper C GND D D Temco SPM1 100 AC GND 12V D D Carlo Gavazzi EM340 EM112 EM330 Connection with Energy Meter...

Page 30: ...4 15 12 16 17 2 3 N 1 7 8 10 11 12 9 N N 1 2 3 4 5 6 3 4 5 6 7 8 N N 1 2 For Carlo Gavazzi meters please follow the meter s manual included in the box EM 112 EM 330 EM 340 EM 340 3 Phase 65 A EM 112 1...

Page 31: ...1 Dans le cas des compteurs Carlo Gavazzi veuillez suivre le manuel du compteur inclus dans la bo te EM 112 1 Phase 100 A EM 330 3 Phase 65 A EM 340 3 Phase 65 A Energy Meter CA 1 Per als comptadors...

Page 32: ...Energy Meter EM 340 7 9 8 10 A T D RS485B B D RS485A GND GND EM 340 Wallbox 7 8 10 11 12 9 N N 1 2 3 4 5 6...

Page 33: ...Energy Meter EM 112 3 4 5 6 7 8 N N 1 2 3 5 4 6 A T D RS485B B D RS485A GND GND EM 112 Wallbox...

Page 34: ...RS485A GND GND EM 330 Wallbox 250 A 600 A CTA 5 X CTD 6S 24 mm 3 50 mm 3 2 Amperage limit 3 Transformer 4 Hole diameter 5 Number of Transformers 400 A CTA 6 X 36 mm 3 EM 330 requires the following cur...

Page 35: ...ng system 1 EM 330 requires the following current transformers based on the amperage limit and the characteristics of the cabling system 1 EM 330 requires the following current transformers based on t...

Page 36: ...1 2 3 4 5 6 Temco SPM1 100 AC Used for 1 Phase installation Up to 100A Clip the power meter to the mains power cable Neutral cable must not be drawn through the clamp 1 2 3...

Page 37: ...Temco SPM1 100 AC FR 1 Used for 1 Phase installation Up to 100A 2 Clip the power meter to the mains power cable 3 Neutral cable must not be drawn through the clamp Temco SPM1 100 AC CA 1 Used for 1 Ph...

Page 38: ...1 2 3 4 5 6 Temco SPM1 100 AC 12 V GND RS485 RS485 CURRENT DIRECTION CABLE...

Page 39: ...3 4 5 6 RS485 D RS485B RS485 Power D RS485A Power GND 12V Voltage Voltage 2 1 SPM1 100 AC Wallbox Electrical Wiring...

Page 40: ...ction is done inside the charger T Connection Copper Copper SB Rev A NT Connection Copper Copper SB Rev A NT Connection Pulsar Plus Commander 2 Copper SB Rev B T Connection Pulsar Plus Commander 2 Cop...

Page 41: ...he charger Cabling Network FR 1 Copper Commander 2 and Pulsar Plus have two slots for input and output cabling so the conjunction is done inside the charger Cabling Network CA 1 Copper Commander 2 and...

Page 42: ...Connection between chargers Commander 2 CAN H CAN H CAN L CAN L T Connection NT Connection CAN NT T...

Page 43: ...Connection between chargers CAN T NT Copper SB Rev B CAN H CAN H CAN L CAN L T Connection NT Connection...

Page 44: ...1 2 3 4 5 6 7 8 9 0 CAN T NT CAN H CAN H CAN L CAN L T Connection NT Connection Connection between chargers Pulsar Plus...

Page 45: ...CAN L CAN L CAN H CAN H T Connection NT Connection CAN T NT Connection between chargers Copper C Copper SB Rev A...

Page 46: ...CAN H CAN L T Connection Commander Connection between chargers...

Page 47: ...1 2 3 4 5 6 7 8 9 0 Pulsar CAN L CAN H T Connection Secondary only con nection...

Page 48: ...ndary chargers Configure the rotary switch for each charger to configure its role 0 Pulsar Commander Copper Secondary Position Charger Configuration Primary Secondary 8 9 Pulsar Plus Commander 2 Coppe...

Page 49: ...haring network consists of one primary charger and up to 24 secondary chargers 2 Configure the rotary switch for each charger to configure its role 3 Any other Stand alone Check the chargers Installat...

Page 50: ...mary charger can be configured from the Wallbox app or touchscreen interface for Commander family chargers A Standard or Business account is needed to configure this functionality For more information...

Page 51: ...be configured from the Wallbox app or touchscreen interface for Commander family chargers 3 A standard or business account is needed to configure this functionality For more information see the corres...

Page 52: ...be supplied to the charging network This value is usually the rated current of the MCB Minimum current per charger From 6 A to 10 A The default value is 6 A Mains Breaker Maximum current The maximum c...

Page 53: ...d to the charging network This value is usually the rated current of the MCB 3 Minimum current per charger From 6 A to 10 A The default value is 6 A 4 The maximum current that can be supplied to the e...

Page 54: ...Configuration Touchscreen Interface 1 Commander In the configuration menu 2 Commander 2 In the configuration menu Settings System Dynamic Power Sharing Settings Dynamic Power Sharing...

Page 55: ...mander In the configuration menu Settings System Dynamic Power Sharing 1 Commander In the configuration menu Settings System Dynamic Power Sharing 1 Commander In the configuration menu Settings System...

Page 56: ...onfiguration Wallbox App All the primary chargers can be configured through the Wallbox App Once connected and synchronized with the charger access through Configurations Menu Dynamic Power Sharing 1...

Page 57: ...1 All the primary chargers can be configured through the Wallbox App 2 Once connected and synchronized with the charger access through Configurations Menu Dynamic Power Sharing Configuration Wallbox A...

Page 58: ...5 89 87 87 15 Danmark 49 69 96759775 Deutschland 34 932 20 95 75 Espa a France 33 1 76 46 09 15 353 14 854 347 Ireland 39 011 1962 2461 Italia 31 20 808 0847 Nederland Norge 47 51 74 20 00 351 308 801...

Page 59: ......

Page 60: ...support wallbox com...

Reviews: