Installation Manual
3.3 Mounting on the wall
Note:
The following drilling plan is not to scale. It may
not be used as a drilling template. Please use only the
specified dimensions from the drilling plan.
Figure 3: Overview of wallbe® LEO
Prerequisites
Recommended mounting height above the floor is 1.00
m -1.10 m up to the lower hole.
The mounted Wallbox must be able to withstand a load
of at least 16 kg.
Installation steps
1. Mark the three mounting holes (Fig. 3) as shown on
the drilling plan.
2. Drill and prepare the mounting holes according to
the type of mounting surface (e.g. dowels for masonry).
The screw diameter must not exceed 8 mm.
3. Screw in the two top fastening screws.
Note:
The fastening screws are not included in the sco-
pe of delivery due to the different types of mounting
surfaces.
4. Hang the mounting plate (Fig. 4) of the Wallbox on
the two fastening screws (slotted holes, Fig. 4).
5. Screw the third fastening screw into the lower hole.
6. Tighten the three fastening screws (approx.12 Nm).
3.4 Mounting on a column
1. Hang the mounting plate of the Wallbox (Fig. 4) on
the three stud bolts of the column (Fig. 5).
2. Screw the three nuts (separate parts set for the co-
lumn) on the stud bolts (Fig. 5) and tighten (approx. 12
Nm).