07.11.2017
8
5.
TRANSPORTATION AND STORAGE
5.1 The SET is transported in its original package by any kind of transport which provides its safety.
5.2 Before the SET is installed it should be stored in its original package in a dry building with natural ventilation.
5.3 The original package of the SET should be used for transportation of the previously installed SET to another place.
6.
DISPOSAL
6.1
The following operations should be performed before the SET is disposed:
•
dismantle of the SET;
•
disassemble the SET. The sequence of disassembling process of the SET is contrary to its assembling sequence;
•
sort the parts by the types of materials used for production of the parts.
6.2
The SET does not contain any hazardous substances.
6.3
Waste disposal is performed according to the requirements of the local Sanitary Regulations and Norms
7.
WARRANTY
7.1 Product warranty period is 12 months .
7.2 The warranty does not cover the following defects:
•
damages acquired during transportation;
•
damages caused by storage, assembling and operation conditions which don’t correspond to the r
equirements of this Operation
Manual.
8
.
MOUNTING GUIDE
8.1
Operating restrictions.
8.1.1
Wooden ceilings cannot be used for the SET mounting.
8.1.2
Suspended ceilings cannot be used for the SET mounting.
8.1.3
The SET cannot be installed in corners.
8.2
Installation of the SET indoors.
8.2.1
Maximum ceiling and floor unevenness level is 8 mm.
8.2.2
When the SET is installed on wooden or parquet floors, etc., it is recommended to use a 16
–
20 mm thick additional
layer of plywood; the dimensions of the plywood sheet are determined on the spot (the sheet should be placed at least on two floor
beams).
8.2.3
Free access to the SET should be provided.
8.3
Preparation for assembling, tools and facilities.
8.3.1
Unpack the SET.
8.3.2
Place the component parts onto the previously prepared surface (table, floor).
8.3.3
Make sure that the delivery completeness corresponds to the Data Sheet for your SET.
8.3.4
The tools used for assembling of the SET are indicated in Table 7:
Table 7
Name
Quantity, pieces
Wrench
S=24х13
mm
1 (included in the supply package)
Hex wrench S=6 mm
1 (included in the supply package)
Hex wrench S=5 mm
1 (included in the supply package)
Plummet
1
Not included in the supply
package
Builder's level
1
Stepladder
1
8.4
Safety measures.
8.4.1
All the SET assembling/disassembling and installation works should be performed by at least 2 persons.
8.4.2
The presence of children during the SET mounting and children’s partaking in the SET mounting are prohibited.
8.4.3
The SET assembling should be performed in steps according to the mounting instructions.
8.5
The sequence of assembling and installation of the SET.
8.5.1
Join the half-ladders