Assembly Instructions
21
Attach Shield
Deck Discharge Shield Installation
PTO Shaft Guard Installation
Position the shaft guard as shown and mount with
two (2) 1/4-20 x 1/2 in. bolts.
Carrier Frame
Tube Sockets
Attach
Guard
PTO Shaft Guard Installation
Tilt-Up Roller Wheel Installation
Mount the two (2) tilt-up roller wheels on the brackets
on the rear skirt of the deck housing using the
P/N 8490 axle bolt, 3/8 in. wave spring washer and
3/8-16 in. Whiz locknut. Tighten the axle bolt until the
wheel rolls freely, but is not loose.
Roller Wheel
Roller Wheel Installation (DSD60 Shown)
Mower Deck Installation on Tractor
Deck Installation
1. Lightly grease each deck support arm (2) on the
tractor. Refer to
Mower Deck Installation
pho-
to for location of deck support arm.
Deck Support
Arms
Mower Deck Installation
2. Engage the LH deck carrier frame tube socket
first on the tractor support arms and then the RH
tube socket. Slide the deck onto the support
arms and install lynch pins to secure deck.
Retract Coupler Ring
3. Retract spring-loaded coupler ring on the PTO
Tube (provided in Owner’s Packet) and insert
coupler tool. Refer to
Quick Coupler Installa-
tion Tool
photo.