background image

12 

After Each Use 

1. 

Clean the interior of the pan regularly after each use.  Do not use wire brushes on the pan.  Clean 

using a mild detergent and a hot water solution using soft cloth or a soft bristled brush.  Dry the 
appliance thoroughly using a dry clean cloth. 

 

Daily Cleaning 

1. 

The water should be drained and re-filled regularly.  Open the drain valve slowly to minimise 

splashing.  Waste water will drain into the tundish  fitted below the appliance drain outlet. 

2. 

When the tank is empty, open the drain valve fully and check for any particles or residue lodged in 
the valve.  Clean out with a stiff nylon brush.  Do not use a wire brush or metal rods as these 

damage the seating in the valve and will eventually lead to valve leakage. 

3. 

If the obstruction in the valve cannot be removed with a brush, use a wooden probe to dislodge any 
obstruction. 

4. 

Clean the control panel using a damp cloth lightly moistened with a solution of mild detergent and 

hot water.  Dry the control panel thoroughly using a dry clean cloth. 

5. 

Clean the interior and exterior of the pasta cooker regularly at the end of each day.  Do not use wire 

brushes on the pan.  Clean using a mild detergent and a hot water solution using soft cloth or a soft 

bristled brush.  Dry the appliance thoroughly using a dry clean cloth. 

6. 

Once the daily cleaning operation is completed, ensure that the drain valve has been closed. 

Cleaning and Maintenance

 

WARNING: 

 

H

OT

 

WATER

 

WILL

 

SCALD

 - 

DO

  

NOT

  

RUSH

  

THIS

  

JOB

WARNING: 

 

D

O

 

NOT

 

ATTEMPT

 

TO

 

MOVE

 

THE

 P

ASTA

 C

OOKER

 

WHILST

 

THE

 

COOKER

 

IS

 

FULL

 

OF

 

WATER

 

B

EFORE

 

ATTEMPTING

 

TO

 

MOVE

 

THE

 P

ASTA

 C

OOKER

ENSURE

 

THAT

 

ALL

 

THE

 

WATER

 

HAS

 

BEEN

 

DRAINED

 

FROM

 

THE

 

TANK

.  R

EFER

 

TO

 

THE

 

INFORMATION

 

ON

 

THE

 

PREVIOUS

 

PAGE

ON

 

HOW

 

TO

 

DRAIN

 

THE

 

WATER

 

FROM

 

THE

 

P

ASTA

 C

OOKER

Fig 3 

Locking Slide 

unlocked position 

Locking Slide 

locked position 

Fig 4 

Summary of Contents for PC8140E

Page 1: ...I n s t a l l a t i o n a n d O p e r a t i o n M a n u a l PC8140E PC8140E 7 Date Purchased Serial Number Dealer Service Provider 232805 5 For use in GB IE Electric Pasta Cooker PCL8140E PCL8140E 7...

Page 2: ...Mail sales blue seal co uk Sales tel 44 121 327 5575 fax 44 121 327 9711 Spares tel 44 121 322 6640 fax 44 121 327 9201 Service tel 44 121 322 6644 fax 44 121 327 6257 UNITED STATES Moffat Web www mof...

Page 3: ...ion 5 Installation Requirements Unpacking Location Clearances Assembly Electrical Connection Water Connection Drainage Connection Commissioning Operation 8 Operation Guide Description of Controls Befo...

Page 4: ...PROPER INSTALLATION ADJUSTMENT ALTERATION SERVICE OR MAINTENANCE CAN CAUSE PROPERTY DAMAGE INJURY OR DEATH READ THE INSTALLATION OPERATING AND MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR...

Page 5: ...The supply cord shall not be lighter than ordinary tough rubber sheathed oil resistant cord e g H05 RN F with sufficient current carrying capacity cable sizes The branch supply line shall be overload...

Page 6: ...4 Dimensions PC 1 8140E Pasta Cooker...

Page 7: ...the installation person Unpacking Remove all packaging and transit protection from the appliance including all protective plastic coating from the door outer panel and exterior stainless steel panels...

Page 8: ...panel to allow connection access for the electrical supply 4 Bring the supply cable up through the grommet at the back of the pasta cooker and through the compression type gland provided on the rear...

Page 9: ...l for the correct electrical requirements Check that all the connections are correct and that all panels have been re fitted Check that the unit functions in accordance with the operating instructions...

Page 10: ...ngle model type This model is fitted with single 3 coil heavy duty pivoting element and is controlled by a 4 position switch and a thermostat for variable speed and temperature control Open tank and p...

Page 11: ...ped into the tank 5 To maintain the correct water level the water tap should be adjusted to give a water flow out of the water supply nozzle that just causes water to continually flow out of the overf...

Page 12: ...icator will illuminate until the temperature is reached NOTE It will take approximately 28 minutes to heat the water in the tank from 20 C to 100 C This time has been calculated for the PC8140E Pasta...

Page 13: ...locking slide away from the valve body to release the valve handle See Fig 3 and rotate the valve handle downwards anticlockwise to open the drain valve See Fig 4 b On completion of the draining and...

Page 14: ...ooden probe to dislodge any obstruction 4 Clean the control panel using a damp cloth lightly moistened with a solution of mild detergent and hot water Dry the control panel thoroughly using a dry clea...

Page 15: ...control panel b Clean the interior and exterior surfaces of the pasta cooker with hot water a mild detergent solution and a soft scrubbing brush c Baked on deposits or discolouration may require a goo...

Page 16: ...s do not heat up Check the mains power is supplied to the unit and that a circuit breaker or fuse has not tripped blown Check that the element is flat and that the tilt microswitch is closed Check tha...

Page 17: ...ker Standard Ex Factory Model Convertible to PC8140E 10 5 kW 3P N E L1 L2 L3 15A 240V 1P N E 44A 240V PC8140E 7 7 0 kW 1P N E 30A 240V 3P N E L1 L2 L3 10A 240V Electrical Supply Requirements ELEMENTS...

Page 18: ...shown on the reverse of the front cover of this manual Controls 231776 Element Assembly 10 5kW PC8140E 232605 Element Assembly 7 0kW PC8140E 7 232744 Element Retaining Pin 232750 Element O Ring 232746...

Page 19: ......

Reviews: